(pH G
pn neo i c
y,.
A, UNITE D STATES
- 4{s
'g NI' CLEAR REGULATORY COMMISSION
.g 3 y
s I
REGION IV 9,7% [I 611 RYAN PLAZA DRIVE, SUITE 1000
\\/
,e AR LINGToN, TE XAS 76012 June 26, 1979 In Reply Refer To:
RIV Docket Nos.
50-458/IE Circular No. 79-10 50-459/IE Circular No. 79-10 Gulf States Utilities Atta:
Dr. J. G. Weigand General Manager, Nuclear Projects Post Office Box 2951 Beaumont, Texas 77704 Centlemen:
This IE Circular is provided as an early notification of a possibly significant matter.
It is expected that recipients will review the information for possible applicability to their facilities. No specific action or response is requested at this time. If further NRC evaluations so indicate, an IE Bulletin will be issued to recommend or request specific licensee actions.
If you have questions 7regarding this matter, please contact the Director of the appropriate NRC Regional Office.
Sincerely, Q
L
'Karl V. Seyfrit Director
Enclosures:
1.
IE Circular No. 79-10 2.
List of IE Circulars Issued in Last 12 Months bb
!!t 7907110 2 M Q
UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 IE Circular No. 79-10 Date:
June 26, 1979 Page 1 of 2 PIPEFITTINGS MANUFACTURED FROM UNACCEPTABLE MATERIAL Description of Circumstances:
Liberty Equipment and Supply Company of Kennewick, Washington and Tube Turns Division, Chemetron Corporation of Louisville, Kentucky reported on April 4 and 12, 1979, respectively, that potentially defective pipe fittings were manufactured from material with a high carbon content beyond the range allowed by ASTM A-234 WPB. These high carbon content fittirgs may crack when welded.
Tube Turns received 3.500 OD x.250W pipe from U. S. Steel - Lorain -
identified as U. S. Steel Heat No. N570028.
A total of 28,153 feet was received and identified by Tube Turns as Lot W6719.
U. S. Steel has not been able to determine the exact number of lengths of pipe of incorrect chemistry, but indicated it could be at least four lengths. From this pipe, 4" - 90 degrees and 45 degrees
.237 wall elbows and 2"
.237 wall straight tees, ASTM A-234 WPB, were produced by Tube Turns.
Each length of pipe is twenty feet and makes from 20 to 30 fittings. Approximately 27,000 fittings were produced and each is identified by Tube Turns Lot No. W6719.
Shipment of these fittings started in March of 1978, and it is estimated all were shipped before the end of 1978.
On May 10, 1979, the Tube Turns Division reported to the NRC that 4" elbows, Lot W6719, have been provided to the nuclear power plants listed below.
U.S.
Steel has tested about one hundred and fifty (150) loose and installed fittings at the seven sites noted by an asterisk.
- Grand Gulf
- 2immer
- Phipps Bend
- Waterford III
- Brown's Ferry Midland Limerick Shc,reham
- LaSalle Sequoyah
- Brunswick Hartsville Bellefonte nn June 1, 1979, the Tube Turns Division reported to the NRC via telephone that of the 160 fittings tested at Nuclear Power Plants, three (3) pieces were found to have a high carbon content and were replaced.
All construction permit holders are ad&""~% _ ""O M W - ~.< w pipefitting receiving documents for th DUPLICATE DOCUMENT and determine if fittings manufacturec p3O p j g-r identified as Tube Turn Lot W6719.
If V
4 were received, appropriata corrective Entire document previously entered k
into system under:
r 7hOh2OO[7f ANO v
No. of pages:
t j
e,we
' -TmM' rZ
' rP M-M chw.mwbMdahsJrmIph LU