ML19256B415
| ML19256B415 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 05/02/1979 |
| From: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| References | |
| NUDOCS 7906130170 | |
| Download: ML19256B415 (1) | |
Text
<-
UNITED STATES g* *8%g
/
?,
NUCLEAR REGULATORY COMMISSION y
~ r-(
E REGION I I!
f
$38 PARK AVENUE j
xiuo or,Russ A, etunsvevama neo.
g
.s May 2,1979 Docket Nos. 50-277 50-278 Philadelphia Electric Company ATTN: Mr. S. L. Daltroff Vice President Electric Production 2301 Market Street Philadelphia, Penr.sylvania 19101 Gentlemen:
The enclosed IE Circular No. 79-07 is forwarded to you for in-forma tion.
No written response is required.
Should you have any questions related to your understanding of this matter, please contact this office.
Sincerely,
[
Boyce H. Grier Director
Enclosures:
1.
IE Circular No. 79-07 2.
List of IE Circulars Issued in Last Twelve Months cc w/encis:
W. T. Ullrich, Station Superintendent Troy B. Conner, Jr., Esquire Eugene J. Bradley, Esquire Raymond L. Hovis, Esquire Warren Rich, Esquire 7 90613 0 / ~/ O
UNITED STATES NUCLEAR REGULATORv COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 IE Circular No. 79-07 Date:
May 2, 1979 Page 1 of 3 UNEXPECTED SPEED INCREASE OF REACTOR RECIRCULATION MG SET RESULTED IN REACTOR POWER INCREASE Description of Circumstances:
On November 24, 1978, an unexpected rapid speed increase was experienced on the 'B' Reactor Recirculation MG set (RRMG) at the Cooper Nuclear Station.
Prior to the event, the RRMG set had been inadvertently tripped during the performance of routine maintenance.
Upon restart, the MG set would not respond to a speed increase signal.
Licensee personnel com-menced trouble shooting this problem in accordance with the instructions in the manufacturer's technical manual.
One step of these instructions suggested ;emoving the fuse from the Bailey scoop tube actuator circuit (a blown fuse would de-energize the actuator and not permit the scoop tube to move).
When the terminal panel cover was removed, licensee personnel noted two fuses instead of one as shown on the vendor drawings.
khen licensee personnel removed the second fuse to verify fuse integrity, a rapid speed increase of the MG set occurred.
This increase was terminated by replacement of the fuse or tripping of the MG set by the control room operator (both actions took place almost simultaneously).
The input signal to the scoop tube actuator is received from the speed controller via a function generator.
This signal is a scoop tube posi-tion demand signal.
As the actuator drives the scoop tube in or out of the fluid coupler, a position followup signal is generated to null the input signal and stop scoop tube motion at the required position.
The vendo"'s drawings of the scoop tube actuator circuit showed only one fuse in the circuit.
The licensee contacted the vendor regarding the second fuse and was informed that this fuse had been added as a change in the initial circuit design to provide protection for certain elec-tronic components in this circui
~
the position followup circuit.
in a loss of the nulling signal DUPLICATE DOCUMENT to the maximum speed position.
Entire document previously entered into system under:
ANO 79 0 S l4 0 Q Cj Z.
N o.
of pages:
[