ML19256B362

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-10, Requalification Training Program Statistics. Written Response Required
ML19256B362
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 05/11/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
References
NUDOCS 7906110119
Download: ML19256B362 (1)


Text

.

UNITED STATES TE R.N g* "'%,,[,

NUCLEAR REGULATORY COMMISSION

/

) !

REGION l f,

'f

.31 PARK AVENUE xina or passsi A.,EnnsvevAn A i,4o.

j May ll, 1979 Docket No. 50-213 Connecticut Yankee Atomic Power Company ATTN: Mr. W. G. Counsil Vice President - Nuclear Engineering and Operations P. O. Box 270 Hartford, Connecticut 06101 Gentlemen:

The enclosed IE Bulletin 79-10 is forwarded tb you for action. A written response is required.

If you desire additional information regarding this matter, please contact this office.

Sincerely, Boyce H. Grier

' Director

Enclosures:

1.

IE Bulletin No. 79-10 2.

List of IE Bulletins Issued in Last Twelve Months cc w/encls:

R. Graves, Plant Superintendent D. G. Diedrick, Manager of Quality Assurance J. R. Himmelwright, Licensing Safeguards Engineer 7906110l19

UNITED STATES NUCLEAR REGULATORY C0f* MISSION OFFICE OF INSPECTION AND ENFORCEMEttT WASHINGTON, D.C.

20555 IE Bulletin No. 79-10 Date:

May 11, 1979 Page 1 of 2 REQUALIFICATION TPAINING PROGRAM STATISTICS Description of Circumstances:

Because of the apparent failure of the operators at Three Mile Island to recognize certain plant conditions and take appropriate action to effec-tively cool the core and contain fission products after release from the core, the NRC Commissioners are evaluating licensee's requalification training programs.

As one element in this evaluation, the NRC is in-terested in obMining statistics about the failure rate on the annual requalification examinations.

The information requested below along with other information will then be used to evaluate the effectiveness of the operator requalification training program.

Action to be Taken by Licensees:

For all power reactor facilities with an operating license.

1.

Provide both the total number and percentage of operators who have failed the annual requalification examination.

2.

Provide the percentage of those operators who take the annual requalification examination and are required to attend lectures on categories of material for which they received a grade of less than 80 percent.

Also provide the total number of supplemental lectures attended (e.g., 3 operators had to attend 2 lectures,1 operator had to attend 3 lectures, etc. ).

3.

Provide both the total number and percentage of operators under the requalification program that participated in accelerated training because they either scored less than 70 percent overall on the annual written examination or had an unsatisfactory performance on the oral examination.

4.

Provide the same informati DUPLICATE DOCUMENT Entire document previously entered into system under:

h[

ANO No. of pages: