ML19256B357

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-10, Requalification Training Program Statistics. Written Response Required
ML19256B357
Person / Time
Site: Dresden, Quad Cities, Zion  
Issue date: 05/11/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
References
NUDOCS 7906110101
Download: ML19256B357 (1)


Text

i ~

' TIC l

((

. t NUCLE AR REGULATORY COMMISSION 4,

UNIT E D STATES 4

f,/-

REGloN lli

  1. 4 r; ye k f*g"4 /

799 noostv t tT soAn

c. t e N t t t
  • N itt>Ncis cou?

'.....~

MAY 11 1979 Docket Nos.

50-10, 50-237, 50-249, 50-254, 50-265, 50-295, and 50-304 Commonwealth Edison Company ATTN:

Mr. Byron Lee, Jr.

Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

The enclosed IE Bulletin No. 79-10 is forwarded to you for action. A written response is required.

If you desire additional information regarding this matter, please contact this office.

Sincerely, h.

James G. Keppler U

Director

Enclosures:

1.

IE Bulletin No. 79-10 2.

List of IE Bulletins Issued in Last Twelve Months cc w/ encls:

Mr. B. B. Stephenson, Central Files Station Superintendent Director, NRR/DPM Mr. N. Kalivianakis, Director, NRR/ DOR Station Superintendent PDR Mr. N. k'andke, Station Local PDR Superintendent NSIC TIC Anthony Roisman, Esq.,

Mr. Dean Hansell, Office Attorney of Assistant Attorney General 7906110l01

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION III May 11, 1979 I" Bulletin No. 79-10 REQUALIFICATION TRAINING PROGRAM STATISTICS Description of Circumstances:

Because of the apparent failure of the operators at Three Mile Island to recognize certain plant conditions and take appropriate action to effec-tively cool the core and contain fission products after release from the core, the NRC Commissioners are evaluating licensee's requalification training programs. As one element in this evaluation, the NRC is interested in obtaining statistics about the failure rate on the annual requalification exaunations. The information requested below along with other information will then be used to evaluate the effectiveness of the operator requalification training program.

Action to be Taken by Licensees:

For all power reactor facilities with an operating license.

1.

Provide both the total number and percentage of operators who have failed the annual requalification examination.

2.

Provide the percentage of those operators who take the annual requalification examination and are required to attend lectures on categories of material for which they received a grade of less than 80 percent. Also provide the total number of supple-mental lectures attended (e.g., 3 operators had to attend 2 lectures, 1 operator had to attend 3 lectures, etc.).

3.

Provide both the total number and percentage of operators under the requalification program that participated in accelerated training because they either scored less than 70 percent overall on the annual written examination or had an unsatisfactory performance on the oral examination.

4.

Provide the same information re uired bv 1 thru Operators.

DUPLICATE DOCUMENT Entire document previously entered nto system under:

ANO

,/

[hh No. of pages:

i