ML19256B344

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-10, Requalification Training Program Statistics. Written Response Required
ML19256B344
Person / Time
Site: Browns Ferry  
Issue date: 05/11/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 7906110066
Download: ML19256B344 (1)


Text

l b'

~

UNtTED ST ATtS

'o NUCLEAR REGULATORY COMMISSION eg, ]

[

[pm R80 0

REGION il 2

7, y, (

g 101 M ARIETT A ST R E ET, N.VV.

{ g%

/

,.g ATLANT A, GE ORGI A 30303 o{

IU1Y 1 11979 In Reply Refel To:

RII:JPO 50-259, 50-260 50-296 Tennessee Valley Authority Attn:

Mr. H. C. Parris Manager of Power 500A Chestnut Street Tower II Chattanooga, Tennessee 37401 Gentlemen:

A The enclosed Bulletin 79-10 is forwarded to you for action.

written response is required. If you der. ire additional information regarding this matter, please contact this office.

Sincerely.

)

Ja=es P. O'Reilly b Director

Enclosures:

1.

IE Bulletin No. 79-10 2.

List of IE Bulletins Issued in Last Twelve Months s

0066

)*

790611

  • e

EkY 11 U19 Tennessee Valley Authority cc w/ encl:

J. E. Gilleland Assistant Manager of Power 500C Chestnut Street Tower II Chattanooga, Tennessee 37401 V. R. Dahnke, Project Manager Post Office Box 2000 Hollywood, Alabama 35752 J. F. Cox 400 Commerce Street W10C131 C Knoxville, Tennessee 37902 D. L. Terrill Project Engineer 400 Cbestnut Street Tower II Chattanooga, Tennessee 37401 t

1 1

~. _

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMEh*T WASHINGTON, D.C.

20555 May 11, 1979 TE Bulletin No. 79-10 REQUALIFICATION TRAINING PROGRAM STATISTICS Description of Circumstances:

Because of the apparent failure of the operators at Three Mile Island to recognize certain plant conditions and take appropriate action to effec-tively cool the core and contain fission products after release from the the fiRC Commissioners are evaluating licensee's requalification training prograns. As one element in this evaluation, the NRC is

core, interested in obtaining statistics about the failure rate on the annual The information requested below along requalification examinations.

with other information vill then be used to evaluate the effectiveness of the operator requalification training program.

Action to be Taken by Licensees:

For all power reactor facilities with an operating license.

Provide both the total nu=ber and percentage of operators who J.

have failed the annual requalification examination.

Provide the percentage of those operators who take the annual 2.

requalification examination and are required to attend lectures on categories of material for which they received a grade of Also provide the total number of supple-less than 80 percent.

cental lectures attended (e.g., 3 operators had to attend 2 lectures, 1 operator had to attend 3 lectures, etc.).

Provide both the total number and percentage of operators under the requalification program that participated in accelerated 3.

training because they either scored less than 70 percent overall on the annual written exa=ination or had an unsatisfactory performance on the oral examination.

Provide the same information required by 1 thru 3 on Senior 4.

Operators.

i, DUPLICATE DOCUMENT Entire document previously entered into system under:

hh/h ANO No. of pages:

W

-