ML19256B342
| ML19256B342 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 05/11/1979 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| References | |
| NUDOCS 7906110065 | |
| Download: ML19256B342 (1) | |
Text
W 'i
(
.56 -39l b
UNITE D ST ATE.
Se at0O
[
'o, NUCLEAR REGULATORY COMMISSION REcion ii g *
,, 'g 3,,( (
101 M ARIETT A ST R E ET. N.W.
5 e
ATLANT A, GEoRol A 30303 6
k'AY I 1 1979 e...e In Reply Ref er To:
RII:JPO 50-321, 50-366 Georgia Power Company Attn:
Mr. J. H. Miller, Jr.
Executive Vice President 270 Peachtree Street, N. W.
Atlanta, Georgia 30303 Gentlemen:
A The enclosed Bulletin 79-10 is forwarded to you for action.
written response is required.
If you desire additional information regarding this catter, please contact this of fice.
Sincerely, L
James P. O'Reilly bDirector
Enclosures:
1.
IE Bulletin No. 79-10 2.
List of IE Bulletins Issued in Last helve Months t
t 0
790611
f4;sY I 11973 Georgia Power company a
cc w/ enc 1:
M. Manry, Plant Manager Post Office Box 442 Baxley, Georgia 31513 C. E. Belflower Site QA Supervisor Post Office Box 442 Baxley, Georgia 31513 L. L. Gray, Jr.
Construction Project Manager Post Office Box 329 Baxley, Georgia 31513 9
l i_
UNITED STATES NUCLEAR REGULATORY COSMISSION OFFICE OF INSPECTION AND ESFORCEMENT WASHINGTON, D.C.
20555 May 11, 1979 IE Bulletin No. 79-10 REQUALIFICATION TRAINING T.00 GRAM STATISTICS Description of Circumstances:
Because of the apparent failure of the operators at Three Mile Island to conditions and take appropriate action to effec-recognize certain plant tively cool the core and contain fission products after release from the the NRC Com issioners are evaluating licensee's requalification
- core, As one element in this evaluation, the NRC is training programs.
interested in obtaining statistics about the failure rate on the annual The information requested below along requalification examinations.
with other information will then be used to evaluate the effectiveness af the operator requalification training program.
Action to be Taken by License?p:
For all power reactor facilities with an operating license.
Provide both the total nu=ber and percentage of operators who J.
have failed the annual requalification examination.
Provide the percentage of those operators who take the annual 2.
requalification examination and are' required to attend lectures on categories of material for which they received a grade of Also provide the total number of supple-less than 80 percent.
mental lectures attended (e.g., 3 operators had to attend 2 lectures, 1 operator had to attend 3 lectures, etc.).
Provide both the total number and percentage of operators under 3.
the requalification program that participated in accelerated training because they either scored less than 70 percent overall on the annual written examination or had an unsatisfactory performance on the oral examination.
Provide the same information required by I thru 3 on Senior 4.
Operators.
i
- PLICATE DOCUMENT Entire document previously entered into system under
h ANO N o.
of pages:
z
-