ML19256B326

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 79-08, Attempted Extortion - Low Enriched U
ML19256B326
Person / Time
Site: Rancho Seco
Issue date: 05/18/1979
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
References
NUDOCS 7906080244
Download: ML19256B326 (1)


Text

,

,i R Is

,f" f'Ol (JNIT ED ST ATEC g

g, J-at NUCLEAR REGULATORY COMMiss!ON 3

Il Fi[Clon v O, 75/

SUITE 202, W ALNUT C REEK PL AZ A

%, ' E

,0 1990 N. C ALIFORNI A UOUL LV A HD wALNur CnrEK, C ALlFOHNI A b 4 5 9 f.

b May 18, 1979 i

l Docket No. 50-312 Sacramento Municipal Utility District P. O. Box 15830 Sacramento, California 95813 Attention: Mr. John J. Mattimoe Assistant General Manager Gentlemen:

The enclosed IE Circular 79-08 is forwarded to you for information.

If there are any questions related to the contents or intent of the Circular or its attachments, please contact this office.

Sincerely,

( H. Engelken ;r 3aow irector

Enclosure:

IE Circular No. 79-08 w/a ttachments cc w/ enclosure:

R. J. Rodriguez, SMOD I

L. G. Schwieger, SMUD l

J 0

t:..

7906080 W ^

O.y[.

VilITED STATES fiUCLEAR REGULATORY COMMISSIO 1 0FFICE OF If4SPECTIO!! Arid ErlFORCE!'EflT WASHiliGTON, D.C.

20555 May 18, 1979 IE Circular flo. 79-08 ATTEMPTED EXTORTION - LOW EilRICllED URAflIUM

Background

In January 1979, a temporary contractor employee who was working at the General Electric plant in Wilmington, tiorth Carolina, allegedly entered the plant and removed a drum containing two 5-gallon cans of low enriched uranium from the facility with the intention of extorting money for the return of the material. The Federal Bureau of Investigation conducted an intensive investigation leading to the arrest of the employee on February 1,1979. All material was recovered and returned to the plant.

Discussion Based on preliminary infonration provided the fiRC, the thef t was allegedly carried out in the following manner:

On Friday, January 26, 1979, the subject worked the day shift.

At 10:50 p.m. the same day he drove back to the plant and entered with the night shif t.

He showed his Florida driver's license at the entrance gate instead of his yellow contractor badge because it had a blue background similar to that on the picture badge which he thought was required to gain access to the area of the plant that he wanted to penetrate.

He had allegedly gained access using his driver's license on previous occasions.

Once inside the plant, the subject would have been guided by gates and fences into a parking area had it not been for the fact that one gate had been removed to allow installation of truck scales.

He proceeded down the unprotected road to an area adjacent to the building 'e wanted to enter.

After the subject entered the building through a personnel door, he proceeded to his normal working station which was the Chem Tech Lab and entered, using his own key.

In the lab h clothing, a two wheel cart used to ship chemicals. Tl He then proceeded to a door DUPLICATE DOCUMENT Entire document previously entered into system under: