ML19256B239

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-08,Events Relevant to BWRs Identified During TMI Incident. Licensee Action Required
ML19256B239
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/14/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
References
NUDOCS 7906070021
Download: ML19256B239 (2)


Text

TeAA e

g UNITED STATES p >* "8 Cog NUCLEAR REGULATORY COMMISSION t

gj

,og REGlONil 3

3 y, Q

101 M ARIETT A STREET, N.W.

O M

'E ATLANTA, GEORGIA 30303

%,..'.f,f mt{

o

,8 APR 141979 In Reply Refer To:

RII:JPO 321 0:16_6 Georgia Power Company Attn: Mr. J. 11. Mill er, Jr.

Executive Vice President 270 Peachtree Street, N. W.

Atlanta, Georgia 30303 Gentlemen:

Enclosed is IE Bul'".in No. 79-08, which requires action by you with reactor facility (les) with an operating license.

regard to your powt.

Should you have any questions regarding this Bulletin or the actions required by you, please contact this office.

Sincerely, f

)

m j d ames P.

'Reilly Director

Enclosure:

IE Bulletin No. 79-08 7 9 0 6 0 7 0 O c2 )

APF 1.; 1979 Georgia Power Company cc w/ encl:

M. Manry, Plant Manager Post Office Box 442 Baxley, Georgia 31513 C. E. Belflower Site QA Ocpervisor Post office box 442 Baxley, Georgia 31513 Uf6 6

UNITED STATES NUCLEAR REGULATORY COPSISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 April 14, 1979 IE Bulletin No. 79-08 EVENTS RELEVANT TO BOILING WATER POWER REACTORS IDENTIFIED DURING THREE MILE ISLAND INCIDEhf Description of Circumstances:

On march 28, 1979 the Three Mile Island Nuclear Power Plant, Unit 2 experienced core damage which result ed f rom a series of events which were initiated by a loss of feedwater transient.

Several aspects of the incident may have general applicability to operating boiling water reactors. This bulletin requests certain actions of licensees of operating boiling water reactors.

Actions to be taken by Li ensees:

For all Boiling water reactor facilities with an operating license complete the actions specified below:

1 Review the description of circumstances described in Enclosure 1 of IE Bulletin 79-05 and the preliminary chronology of the TMI-2 3/28/79 accident incloded in Enclosure I to IE Bulletin 79-05A.

This review should be directed toward understanding:

(1) the a.

extreme seriousness and consequences of the simultaneous blocking of both trains of a safety system at the Three Mile Island Unit 2 plant and other actions taken during the early phases of the accident; (2) the apparent operational errors which led to the eventual core damage; and (3) the necessity to systematically analyze plant conditions and parameters and take appropriate corrective action.

b.

Operational personnel should be instructed to (1) not override automatic action of engineered safety features unless continued operation of engineered safety features will result in unsafe plant conditions (see Section 5a of this bul

' M etsfons based solel r wre E DUPLICATE DOCUMENT ne Entire document previously entered into system under:

[

d V 2,. Y d / 2 7 ANO N o.

of pages: