ML19256B197

From kanterella
Jump to navigation Jump to search
Ack Receipt of 790103 Interim Rept on Torus Beam Weld Indications
ML19256B197
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/16/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hines E
DETROIT EDISON CO.
References
NUDOCS 7901240257
Download: ML19256B197 (1)


Text

T b

[

W UNITED STATES 4

fi NUCLEAR REGULATORY COMMISSION

,J

,1 REGloN lit e '.. jyn] -'/ g 799 ROOSEVELT ROAD f

\\'

f GLEN E LLYN. ILLINOIS 60137 JAT41L

.79 Docket No. 50-341 The Detroit Edison Company ATTN:

Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 48226 Gentlemen:

Thank you for your interim report dated January 3,1979, pursuant to 10 CFR 50.55(e) regarding torus ring beam weld indications. We will review your final report on this matter upon receipt.

Your cooperation with us is appreciated.

Sincerely, h.

f R. F. Heishman, Chief Reactor Construction and Engineering Support Branch cc:

Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Eugene B. Thomas, Jr.,

Attorney 7 9 012 4 0 2J7 J