a

e

,

UNITED sT ATEs

g>* 88 C9

![y ',_" [ j

'o,

NUCLE AR REGULATORY COMMISSION

REGION u

--

101 M ARIETT A sTRE E T, N W.

-

C

g

f

ATL ANTA. GEORGI A 30303

s,

.-

f

....."

DEC 13 1978

In Reply Refer To:

RII:FSC

50-321/78-37

50-366/78-47

Georgia Power Company

ATTN:

Mr. J. H. Miller, Jr.

Executive Vice President

,

270 Peacht ree St reet , N.W.

Atlanta, Georgia 30303

Gentlemen:

This refers to the inspection conducted by Mr. F. S. Cantrell of this office

on November 14-17, 1978, of activities authorized by NRC Operating License

No. DPR-57 and Operating License No. NPF-5 for the E. I . Hatch Unit I and 2

facility, and to the discussion of our findings held with Mr. Max Manry at

the conclusion of the inspection.

4

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items.

The status of these items is

discussed in the enclosed report.

Four new unresolved items resulted from this inspection and are discussed in

the enclosed report. These items will be examined during subsequent inspections.

In accordance with Saction 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

a a written application within

proprietary, it is necessary that you

20 days to this office to withhold such ..iformation f rom public disclosure

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the information is proprietary, and should

be prepared so that proprietary information identified in the application is

contained in a separate part of the document.

If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

79011703pf

.

s

DEC 13 1978

.

Georgia Power Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

u

-~~c~

~

.

- _ .

m

F. J. Long, Chief

Reactor Operations 2nd Nuclear

Support Branch

Enclosure

Inspection Report Nos. 50-321/78-37

and 50-366/78-47

cc w/ encl:

Mr. M. Manry, Plant Manager

Plant E. 1. Hatch

P. O. Box 442

-*

Baxley, Georgia 31513

Mr. C. E. Belflower

Site QA Supervisor

Plant E,

I. Hatch

P

O.

Box 442

Baxley, Georgia 31513