ML19256A793
| ML19256A793 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 12/29/1978 |
| From: | Murray T TOLEDO EDISON CO. |
| To: | Tambling T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 7901160161 | |
| Download: ML19256A793 (1) | |
Text
TELEcopy Q 3L,,,.;,,,,
Verified Re:3.4 pt. g' ~'
Dato A *d/7y
$T, AMtbls4pr&,---
December 29, 1978 TO:
U. S. Nuclear Regulatory Co= mission Office of Inspection and Enforcement Region III Attention: Tom Tambling
SUBJECT:
Reportable Occurrence Per Technical Specification 6.9.8.f Davis-Besse Unit 1 Mode 4, Power (%T) = 0 and Load (MWE) = 0 During startup operations on December 28, 1978, the unit entered Mode 4 at 1720 hours0.0199 days <br />0.478 hours <br />0.00284 weeks <br />6.5446e-4 months <br />. At 1930 hours0.0223 days <br />0.536 hours <br />0.00319 weeks <br />7.34365e-4 months <br />, both Containment Spray Pump Motor Breakers were found to be rat.ked out.
The heatup was immediately stopped, and the breakers were racked in at 2025 hours0.0234 days <br />0.563 hours <br />0.00335 weeks <br />7.705125e-4 months <br />. The apparent cause of this event was personnel erro::.
Further investigation is in progress.
.T. Tambling, NRC Region III, notified via telephone at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> on December 29, 1978.
i fW/ 0 N4Wl/M2f f
Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station Toledo Edison Company i
TDM/JRL/1jk i
t i
i E
So-3G i 0Y i
9 30 790116016\\
\\
S
,