Reportable Occurrence on 781228:during Startup,Both Containment Spray Pump Motor Breakers Were Found to Be Racked Out,Caused by Personnel Error
ML19256A793
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/29/1978
From: Murray T
TOLEDO EDISON CO.
To: Tambling T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 7901160161
Download: ML19256A793 (1)


Text

TELEcopy Q 3L,,,.;,,,,

Verified Re:3.4 pt. g' ~'

Dato A *d/7y

$T, AMtbls4pr&,---

December 29, 1978 TO:

U. S. Nuclear Regulatory Co= mission Office of Inspection and Enforcement Region III Attention: Tom Tambling

SUBJECT:

Reportable Occurrence Per Technical Specification 6.9.8.f Davis-Besse Unit 1 Mode 4, Power (%T) = 0 and Load (MWE) = 0 During startup operations on December 28, 1978, the unit entered Mode 4 at 1720 hours0.0199 days <br />0.478 hours <br />0.00284 weeks <br />6.5446e-4 months <br />. At 1930 hours0.0223 days <br />0.536 hours <br />0.00319 weeks <br />7.34365e-4 months <br />, both Containment Spray Pump Motor Breakers were found to be rat.ked out.

The heatup was immediately stopped, and the breakers were racked in at 2025 hours0.0234 days <br />0.563 hours <br />0.00335 weeks <br />7.705125e-4 months <br />. The apparent cause of this event was personnel erro::.

Further investigation is in progress.

.T. Tambling, NRC Region III, notified via telephone at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> on December 29, 1978.

i fW/ 0 N4Wl/M2f f

Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station Toledo Edison Company i