Forwards IE Insp Rept 50-364/78-19 on 781128-1201.No Noncompliance Noted
ML19256A778
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/20/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Barton A
ALABAMA POWER CO.
Shared Package
ML19256A777 List:
References
NUDOCS 7901160136
Download: ML19256A778 (2)


See also: IR 05000364/1978019

Text

.

,

[jk*RfCoqjo,,

NUCLEAR REGULATORY COMMISSION

UNITED STATES

,

R EGloN 11

{

y,

g

.

-

g

101 M ARIETTA STREET, N.W.

e

ATLANTA, GEORGI A 30303

o

%*****/

DEC 2 01978

In Reply Refer To:

RII:DKW

50-364/78-19

Alabama Power Company

ATTN:

Mr. A. R. Earten

Executive Vice President

-

P'ost Office Box 2641

Birmingham, Alabama 35291

Gentlemen:

This refers to the inspection conducted by Mr. D. K. Walters of this office

on November 28, 1978 - December 1,

1978, of activities authorized by NRC

Construction Permit No. CPPR-86 for the Joseph M. Farley Plant, Unit 2

facility, and to the discussion of our findings held with Mr. R. E. Hollands

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of t.hese items is dis-

cussed in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within

20 days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the information is proprietary, and should

be prepared so that proprietary information identified in the application is

contained in a separate , art of the document. If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

7901160/3 6

.

.

~.

DEP$0 N'

Alabama Power Company

-2-

.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

'

Charles E. Murphy, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

Inspection Report No. 50-364/78-19

cc:

Mr. R. E. Hollands , Jr. , QA ' Supervisor

Ashford, Alabama 36312