Text
fA
.*
-
J#
4
UNITED STATES
j
NUCLEAR REGULATORY COMMisslON
..
.
REGION I
,
- $s
C
k
KING OF PRUSSI A, PENNSYL.VANI A 19406
.....
fF/ 2 41973
Docket Nos. 50-245
50-336
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Combined Inspection 50-245/78-35 and 50-336/78-32
This refers to the inspection conducted by Dr. R. Bores of this office
on October 25-27, 1978, at Millstone Nuclear Power Station, Units 1 and
2, Waterford, Connecticut, of activities authorized by NRC License Nos.
DPR-21 and DPR-65, and to the discussions of our findings held by Dr.
Bores with Mr. J. Opeka and other members of your staff at the conclusion
of the inspection, and to a subsequent telephone discussion between Dr.
Cores and Mr. Opeka on November 7, 1978.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, measurements made by the inspector, and observations by the
inspector.
Our inspector also verified the steps you have taken to correct the
items of noncompliance brought to your attention in a letter dated
August 29, 1978.
We have no further questions regarding your action at
this time.
-
Within the scope of this inspection, no items of noncompliance were
observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractor)
79010 5 0cd
.
.
,
Northeast Nuclear Energy Company
2
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclosure.
Any such application must be accompanied by an
affidavit executed by the owner of the information, which identifies the
document or part sought to be withheld, and which contains a statement
of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b) (4) of Section
2.790.
The information sought to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not
hear from you in this regard within the specified period, the report
will be placed in the Public Document Room.
No reply to this letter is required; however, should you have any
questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
,
G org/H. Smith, Chief
C
uel Facility and Materials Safety
, Branch
Enclosure:
Office of Inspection and Enforcement Combined Inspection
Report Numbers 50-245/78-35 and 50-336/78-32
cc w/ encl:
J. F. Opeka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Himmelwright, Licensing Safeguards Engineer
A. Z. Roisman, Natural Resources Defense Council (Without Report)