ML19254F603

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 79-26, Breach of Containment Integrity. No Action Required
ML19254F603
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 11/05/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
References
NUDOCS 7911160034
Download: ML19254F603 (1)


Text

{{#Wiki_filter:' spo nto, u [ o,, UNITED STATES y, c, g NUCLEAR REGULATORY COMMISSION 3 -lf' .j REGION I 0, ?* g 631 PARK AVENUE D ,o KING OF PRUSSIA. PENNSYLVANI A 19406 Docket No. 50-213 N0'l 0 t a s Connecticut Yankee Atomic Power Company ATTN: Mr. W. G. Counsil Vice President - Nuclear Engineering and Operations P. O. Box 270 Hartford, Connecticut 06101 Gentlemen: This Information Notice is provided as an early notification of a possible significant matter. It is expected that recipients will review the information for possible applicability to their facilities. No specific action or response is requested at this time. If further NRC evaluations so indicate, an IE Circular, Bulletin, or NRR Generic Letter will be issued to recommend or request specific licensee actions. If you have any questions regarding the matter, please contact this office. Sincerely,

WAYf, f

n Boyce H. Grier - Director

Enclosures:

1. IE Information Notice No. 79-26 2. List of IE Information Notices Issued in the Last Six Months CONTACT: D. L. Caphton (215-337-1266) cc w/encls: R. Graves, Plant Superintendent D. G. Diedrick, Manager of Quality Assurance J. R. Himmelwright, Licensing Safeguards Engineer 135\\ 518 (7) 29n no

ENCLOSURE 1 SSINS: 6870 Accession No: 7908220133 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D. C. 20555 IE Information Notice No. 79-26 Date: November 5, 1979 Page 1 of 2 BREAC." 0F CONTAINMENT INTEGRITY Description of Circumstances: On September 14, 1979, the Consumers Power Company (CPC) notified the NRC of discovery at the Palisades Nuclear Generating Plant of a valve misalignment that had resulted in containment integrity being breached for an indeterminate length of time. While preparing to perform a Type "C" leak test between two manual valves in a 3" bypass line around the main 48" containment purge valve, plant personnel discovered that both of these manual isolation valves were locked in the open position. These valves should have been locked closed. Investigation by the licensee indicated that the valves may have been improperly positioned since April,1978, when an efficiency test of the bypass line filters was performed. The plant has operated at power for the major portion of that time period. The valve misalignment had no actual impact on the public health. However, in the event of a design basis accident wherein fuel damage and release of primary coolant inside the containment are postulated, the open valves would provide a significant path for a radioactive release from the containment. The initial design purpose for the bypass system was to provide a long term hydrogen contro basisaccident.-{capabilityforthecontainmentatmospherefollowingadesign It was intended that after approximately 30 days following an accident, when containment pressure and activity levels dropped sufficiently to permit venting, this system would be manually valved to vent the containment atmosphere, through high efficiency and charcoal filters, to the exhaust stack. Thus the components in the bypass line beyond the two manual isolation valves were not designed for the severe service they would be exposed to with the valves open during the initial pressure surge of the design basis accident, and significant uncontrolled release would result. High radiation in the ~ vicinity of the bypass line would also M a ba * + a ~ ' ' ' isolation valves, even if identified as hazardous operation. DUPLICATE DOCUMENT The principal cause for this event was proper use and positioning of these vals Entire document previously valve line up checklist, which is perfor entered into system under: gno ) f $ h h B b 1/ Current NRC requirements call for tt control hydrogen buildup. Palisades has No. of Pages: ,}}