ML19254F398
| ML19254F398 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 09/28/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML19254F399 | List: |
| References | |
| NUDOCS 7911090191 | |
| Download: ML19254F398 (2) | |
See also: IR 05000321/1979029
Text
!
,
o
UNITED STATES
h-3W
!
NUCLEAR REGULATORY COMMISSION
gg
n
N
g
a e
REGION 11
g
/[
101 MARIETTA ST., N.W., SulTE 3100
o,
ATLANTA, GEORGIA 3o3o3
In Reply Refer To:
RII:RFRIII
50-321/79-29
50-366/79-33
.
Georgia Power Company
Attn:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, Georgia 30303
Gentlemen:
This refers to the inspection conducted by Ross F. Rogers of this office on
August 4 through September 4, 1979 of activities authorized by NRC License Nos.
DPR-57 and NPF-5 for the Hatch facilities, and to the discussion of our findings
held with M. Manry at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is dis-
cussed in the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
1309
328
von 0 o/h.
9
.
a
Georgia Power Company
-2-
SEP 2 81979
,
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
.
E4.
R. C.
ewis, Acting Chief
Reactor Operations and
Nuclear Support Branch
Enclosures:
Inspection Report Nos. 50-321/79-29
and 50-366/79-33
cc w/ enclosures:
M. Manry, Plant Manager
Post Office Box 442
Baxley, Georgia 31513
C. E. Belflower
Site QA Supervisor
Post Office Box 442
Baxley, Georgia 31513
W. A. Widner
Manager-Nuclear Operations
Georgia Power Company
Post Office Box 4545
Atlanta, Georgia 30303
1309
329
.
O