Forwards IE Bulletin 79-13,Revision 2, Cracking in Feedwater Sys Piping. No Action Required
ML19254F193
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 10/17/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
References
NUDOCS 7911070306
Download: ML19254F193 (1)


Text

a afc 7 7d'--

ab ga w

g UNITED STATES

[ g ~fj NUCLEAR REGULATORY COMMISSION V'V I

REGION I 3 'idb

'8 G31 PARK AVENUE o,

[

KING OF PRUSSIA, PENNSYLVANIA 19406 October 17, 1979 Docket Nos. 50-245 50-423 Northeast Nuclear Energy Company ATTN: Mr. W. G. Counsil Vice President - Nuclear Engineering and Operations P. O. Box 270 Hartford, Connecticut 06101 Gentlemen:

The enclosed IE Bulletin 79-13, Revision 2, is forwarded to you for information.

No written response is required.

If you desire additional information regarding this matter, please contact this office.

Sincerely, h f.

n oyce H. Grier

' Director

Enclosures:

1.

IE Bulletin No. 79-13 w/ Attachments 2.

Listing of IE Bulletins Issued in Last 6 Months cc w/encls:

K. W. Gray, Construction Quality Assurance Lead H. R. Nims, Director of Nuclear Projects J. F. Opeka, Station Superintendent D. G. Diedrick, Manager of Quality Assurance J. R. Himmelwright, Licensing Safeguards Engineer CONTACT:

L. E. Tripp 337-5282 1-)07 oo 4

,,,3 ic 291107o 2 o 6 9

ENCLOSURE 1 a,

SSINS:

6830 Accession No.:

7908220135 UNITED STATES NUCLEAR REGULATORY COMMISSION JFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 October 17, 1979 IE Bulletin No. 79-13 Revision 2 Page 1 of 5 CRACKING IN FEEDWATER SYSTEM PIPING Description of Circumstances:

This revision to IE Bulletin No. 79-13 is based on the results of the radi_ographic examinations and ongoing investigation of the subject problem to date since the initial Bulletin was issued. The revision reduces in scope the number and R2 extent of the piping system welds required to be examined. The requirements for reporting and action time frame remain unchanged.

On May 20, 1979, Indiana and Michigan Power Company notified the NRC of cracking in two feedwater lines at their D. C. Cook Unit 2 facility.

The cracking was discovered fol, wing a shutdown on May 19 to investigate leakage inside contain-ment.

Leaking circumferential cracks were identified in the 16-inch feedwater elbows adjacent to two steam generator nozzle elbow welds. Subsequent radiographic examination revealed crack indications in all eight steam generator feedwater lines at this location on both Units 1 and 2.

On May 25, 1979, a letter was sent to all PWR licensees by the Office of Nuclear Reactor Regulation which informed licensees of the D. C. Cook failures and requested specific in#ormation on feedwater system design, fabrication, inspec-tion and operating histories. To further explore the generic nature of the cracking problem, the Office of Inspection and Enforcement requested licensees of PWR plants in current outages to immediately conduct volumetric examination of certain feedwater piping welds.

As a result of these actions, several other licensees with Westinghouse steam generators reported crack indications.

Southern California Edison reported on June 5, 1979, that radiographic examination revealed indications of cracking in feedwater nozzle-to-pipe welds on two of three steam generators of San Onofre Unit 1.

On June 15, 1979, Carolina Power and Light reported that radiography showed crack indications in similar locations at their H. B. Robinson Unit 2.

Duquesne Power and Light confirmed on June 18, 1979, that radiography has shown cracking in their Beaver Valley Unit 1 feedwater piping-to-vessel nozzle weld.

Public Service Electric and Gas Company reported on June 20, 1979 that Salem Unit 1 also has crack indications. Wisco n

June 20, 1979 to cut out a feedwater nozz able indication, for metallurgical examin May 25, 1979 seven other PWR facilities h DUPLICATE DOCUMENT pipe welds without finding cracking indic Entire document previously NOTE: