Text
N e,p >^ % rf,'4 g
UNITED FTATES
[ %. ~ q.;'
j NUCLEAR REGULATORY COMMISSION M., v '
c REGION I
'3, "% $U!d:. / [
631 PARK AVENUE
%.... *,[
Kl*wG OF PRUSSI A, PE NNSYLV ANI A 19406 October 17, 1979 Docket No. 50-336 Northeast Nuclear Energy Company ATTN: Mr. W. G. Counsil Vice President - Nuclear Engineering and Operations P. O. Box 270 Hartford, Connecticut 06101 Gentlemen:
Enclosed is IE dulletin 79-13, Revision 2, which requires action by you with regard to your power reactor facility (ies) with an operating license.
Should you have any questions regarding this Bulletin or the actions required by you, please contact this office.
Sincerely,
/ k Y. W ct cyce H. Grier
~ Director
Enclosures:
1.
IE Bulletin No. 79-13 w/ Attachments 2.
Listing of IE Bulletins Issued in Last 6 Months cc w/encls:
J. F. Opeka, Station Superintendent D. G. Diedrick, Manager of Quality Assurance J. R. Himmelweight, Licensing Safeguards Engineer CONTACT:
L. E. Tripp 1291 0()1 337-5282 79139,0 lDS m
ENCLOSURE 1 SSINS:
6830 Accession No.:
7908220135 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSFECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 October 17, 1979 IE Bulletin No. 79-13 Revision 2 Page 1 of 5 CRACKING IN FEEDWATER SYSTEM PIPING Description of Circumstances:
This revision to IE Bulletin No. 79-13 is based on the results of the radiographic examinations and ongoing investigation of the subject problem to date since the inicial Bulletin was issued.
The revision reduces in scope the number and R2 extent of the piping system welds required to be examined.
The requirements for reporting and action time frame remain unchanged.
On May 20, 1979, Indiana and Michigan Power Company notified the NRC of cracking in two feedwater lines at their D. C. Cook Unit 2 facility.
The cracking was discovered following a shutdown on May 19 to investigate leakage inside contain-ment.
Leaking circumferential cracks were identified in the 16-inch feedwater elbows adjacent to two steam generator nozzle elbow welds. Subsequent radiographic examination revealed crack indications in all eight steam generator feedwater lines at this location on both Units 1 and 2.
On May 25, 1979, a letter was sent to all PWR licensees by the Office of Nuclear Reactor Regulation which informed licensees of the D. C. Cook failures and requested specific information on feedwater system design, fabrication, inspec-tion and operating histories.
To further explore the generic nature of the cracking problem, the Office of Inspection and Enforcement requested licensees of PWR plants in current outages to immediately conduct volumetric examination of certain feedwater piping welds.
As a result of these actions, several cther licensees with Westinghouse steam generators reported crack indications.
Southern California Edison reported on June 5,1979, that radiographic examination revealed indications of cracking in feedwater nozzle-to-pipe welds on two of three steam generators of San Onofre Unit 1.
On June 15, 1979, Carolina Power and Light reported that radiography showed crack indications in similar locations at their H. B. Robinson Unit 2.
Duquesne Power and Light confirmed on June 18, 1979, that radiography has shown cracking in their Beaver Valley Unit 1 feedwater piping-to-vessel nozzle weld.
Public Service Electric and Gas Company reported on June 20, 1979 that Salem Unit 1 also has crack indications.
Wisco June 20, 1979 to cut out a feedwater nozz able indication, for metallurgical examin May 25, 1979 seven other PWR facilities h DUPLICATE DOCUMENT pipe weld; without finding cracking indic Entire document previously entered into s t
d NOTE: R1 and R2 indicates lines revised
^= Y d @ys em un er:
d /3 1291 002 No. of pages: