ML19254E938

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-416/79-20 & 50-417/79-20 on 790912-13.No Noncompliance Noted
ML19254E938
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 09/25/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML19254E939 List:
References
NUDOCS 7911050083
Download: ML19254E938 (2)


See also: IR 05000416/1979020

Text

fW

.a

<.

  1. pn nouq

go W/d

W

jo,,

UNITED STATES

/// 7

(

!

NUCLEAR REGULATORY COMMISSION

n

$

I

REGION 11

0,,

101 M4RIETTA ST., N.W SulTE 3100

% ...+

ATL AN GEORotA 303o3

251979

In Reply Refer To:

RII:JKR

50-416/79-20

50-417/79-20

Hississippi Power and Light Company

ATTN:

N. L. Stampley

Vice President of Production

P. O. Box 1640

Jackson, MS 39205

Gentlemen:

This refers to the inspection conducted by J. K. Rausch of this office on

September 12-13, 1979, of activities authorized by NRC Construction Permit Nos.

CPPR-118 and CPPR-119 for the Grand Gulf Nuclear Power Plant facility, and to

the discussion of our findings held with J. C. Fuller at the conclusion of the

inspection.

Areas examined during the inspection and our ficidings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observacions by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be, prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specifit.d ariod,

l

the report will be placed in the Public Document Room.

.

e

1268 3M

7911050

I

h

.

.

~

SEP 2 51979

.

Mississippi Power and Light Company

-2-

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

4

C. E. Mu

'y, Chief

Reactor ConstrucA on and Engineering

Support Branch

Enclosure:

Inspection Report Nos. 50-416/79-20,

and 50-417/79-20

cc w/ enc 1:

C. K. McCoy

Plant Manager

P. O. Box 756

Port Gibson, MS 39150

...

.