ML19254E780

From kanterella
Jump to navigation Jump to search
Forwards Final Deficiency Rept Re Design Deficiency of Pipe Hangers
Date released: 09/25/2019 Download: ML19254E780


Final Deficiency Rept Re Excessive load-pin Clearance in QA Level I Pipe Support Struts.Strut Assemblies Will Be Redesigned to Incorporate Struts Equipped W/Close Clearance Spherical Bearings in End Connections
ML19254E783
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/23/1979
From: Casiglia J, Colber W, Sigetich M
DETROIT EDISON CO.
To:
References
Download: ML19254E783 (4)
Forwards Final Deficiency Rept Re Design Deficiency of Pipe Hangers
ML19254E779
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/25/1979
From: Fahrner W
DETROIT EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19254E779 (1)