ML19254E669

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-338/79-35 & 50-339/79-48 on 790910-14.No Noncompliance Noted
ML19254E669
Person / Time
Site: North Anna  
Issue date: 09/26/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Proffitt W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML19254E670 List:
References
NUDOCS 7911020143
Download: ML19254E669 (2)


See also: IR 05000338/1979035

Text

y

'o

UNITED STATES

b

8'

NUCLEAR REGULATORY COMMISSION

E'7

o

'

g

a

REGION 11

o

101 MARIETTA ST., N.W., SulTE 3100

o

ATLANTA, GEORGIA 3o3o3

.....

SEP 2 61979

In Reply Refer To:

RII:GRJ

50-338/79-35

50-339/79-48

Virginia Electric and Power Company

ATTN:

W. L. Proffitt

Senior Vice President, Power

P. O. Box 26666

Richmond, VA 23261

Gentlemen:

This refers to the inspection conducted by G. R. Jenkins of this office on

September 10-14, 1979, of activities authorized by NRC License No. NPF-4 and

Construction Permit No. CPPR-78 for the North Anna facility, and to the dis-

cussion of our findings held with W. R. Cartwright at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement u.atters. These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

.

f pf 2 A

7 91102 0 /W

.

SEP 2 61979

.

Virginio Electric and Power Company

-2-

.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

ibl Y r

,

J. T. Sutherland, Chief

Fuel bacility and Materials

Safety Branch

Enclosure:

Inspection Report Nos. 50-338/79-35,

and 50-339/79-48

cc w/ encl:

W. R. Cartwright, Station Manager

Box 402

Mineral, VA 23117

P. G. Perry

Senior Resident Engineer

P. O. Box 38

Mineral, VA 23117

,

O

gT

+70