ML19254E591

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-335/79-19 on 790813-17 & Notice of Violation.Notice of Violation Withheld (Ref 10CFR2.790)
ML19254E591
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/14/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML19254E588 List:
References
NUDOCS 7911010539
Download: ML19254E591 (2)


See also: IR 05000335/1979019

Text

MATERIALTRMSMITTED HEREWITH

,

  1. ./%q'o,,

CONTA!HS 2.7:3 !::f;MATION

UNITED STATES

8

NUCLEAR REGULATORY COMMISSION

o

.

g

r

REGION 11

o

101 MARIETTA ST N.W.,SulTE 3100

k

ATLANTA, GEORGIA 30303

g.....

SEP 141979

In Reply Refer To:

RII:JAD

~

50-335/79-19

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President

Advanced Systems and Technology

P. O. Box 529100

Miami, FL 33152

Gentlemen:

This refers to the inspection conducted by J. A. Dyer of this office on

August 13-17, 1979, of activities authorized by NRC Operating License No. DPR-67

for the St. Lucie 1 facility, and to the discussion of our findings held with

C. M. Wethy at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and repr.esentative records, interviews with

personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed here-

with as Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Section 2.201 requires you to submit to this office,

within 20 days of your receipt of this notice, a written statement or

e::planation in reply including:

(1) corrective steps which have been taken by

you and the results achieved; (2) corrective steps which will be taken to avoid

further noncompliance; and (3) the date when full compliance will be achieved.

Details of activities involving safeguards and security measures are exempt from

public disclosure in accordance with 10 CFR 2.790(d). Therefore, the response

to Appendix A requested above should be incorporated in a separate paper and

referenced to your reply.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter with the exception

of Appendix A, and the enclosed inspection report will be placed in ,the NRC's

Public Document Room.

If this report contains any information other than that

in Appendix A that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

1283

148

MATERIA!.TRA'.!S"!TTED REREW!TH

7g31010

1

CONTAINS 2.7E]i;.'F;. EAT 10N

'

MATERIALTRASti!1T D HEREWITH

-

C0NIAlHS 2.7E0 l'!iORI.lATION

Florida Power and Light

-2-

.

Company

4 gg79

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

'

E. c.

R. C.

ewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

'

Enclosures:

1.

Appendix A, Notice of Violation

(Exempt from Disclosure)

2.

Inspection Report No. 50-335/79-19

(Exempt from Disclosure (Page 8))

3.

Inspection Summary

(Not Exempt)

cc w/encls:

C. M. Wethy, Plant Manager

P. O. Box 128

Ft. Pierce, FL 33450

Nat Weems, Assistant QA Manager

P. O. Box 128

Ft. Pierce, FL 33450

1283

149

/

_.

-

MATERIAL TRANSf.!!TTED HEf!EWITH

CONTAli:S 2.7 31:iFOR.'llil0N