ML19254E503

From kanterella
Jump to navigation Jump to search
Forwards LER 79-057/03X-1
Date released: 09/25/2019 Download: ML19254E503


LER 79-057/03X-1:on 790717,during Normal Power Operation, Safety Relief Valve F013E Lifted & Reset Approx Five Minutes Later at 970.Cause Unknown.Electrical Check Made of Valve Operator.Valve Solenoid Replaced
ML19254E513
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 10/29/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19254E513 (2)
Forwards LER 79-057/03X-1
ML19254E502
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 10/29/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19254E502 (1)