g VERMONT Y AN KEE NUCLEAR POWER CORPORATION SEVENTY SEVEN GROVE STREET B.4.2.1 WVY 79-109 RUTLAND, VERMONT 05701 REPLY TO:
ENGINEERING OFFICE TURNPPKE RO AD WESTBORO. M ASS ACHUSETTS 01581 TELEPHONE GI7-344-9011 September 21, 1979 United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 Attention:
Office of Inspection and Enforcement Mr. Boyce H. Grier, Director
References:
(1) License No. DPR-28 (Docket No. 50-271)
(2) USNRC Letter to VYNPC dated August 7, 1979 IE Bulletin 79-18
Dear Sir:
Subject:
Response to IE Bulletin 79-18; Audibility Problems Encountered on Evacuation of Personnel from High-Noise Areas The following is submitted in response to your request concerning Vermont Yankee's alarm / evacuation system.
Item 1 - An extensive survey was conducted by the Vermont Yankee staff and Gai-tronics Company in October, 1976, to determine those areas of the plant which Jid not provide adequate audible (alarm) capability.
As a result of the subsequent evaluation, the system was improved to correct the deficient areas found during the above survey.
In addition, a tone generator and.
volume boost circuit were also installed.
The tone generator can be heard throughout the plant while the volume boost affects outside speakers only.
Since the October, 1976 survey, other questionable areas have been identified during Emergency and Fire Drills and are listed below.
These areas were identified as areas where announcements were not at all times intelligible.
a)
Turbine Building, outside lube oil storage room, elevation 248' b)
Turbine Building, east wall by south access to Reactor Building, elevation 252' n,,
y c)
South Warehouse, remote areas i
s..
d)
Old Service Building, rest room, elevation 260' e)
A0G Building, Dryer Skid Room "B"
7 910310 h I
United States Nuclear Regulatory Commission September 21, 1979 Attention:
Mr. Boyce H. Grier, Director Page 2 Item 2 - The communication system will be further modified to incorporate a second distinctive tone alarm to be used (exclusively) prior to Local Emergency announcements.
In addition, the necessary procedures will be revised to require all personnel to take pre-established steps leading to evacuation, if required, upon the initiation of this special alarm. These actions would include identification of the alarm, proceeding to a location, if necessary, to clearly hear the subsequent announcement or calling his immediate supervisor for further direction.
This modification will be completed by December 5,1979, dependent upon the receipt of the necessary hardware.
Following the installation of the tone alarm, the problem areas noted in Item 1 will be resurveyed.
If the new alarm is determined to be inadequate for the areas, further correction act'ons will be pursued and a new schedule will be submitted to your office at that time.
We trust that the above supplied information adequately addresses the requests contained in Reference (b); however, should you desire any additional information, do not hesitate to call.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION
\\
D. E. Moody Manager of Operations dmp r-
,;-