ML19254D917

From kanterella
Jump to navigation Jump to search
Forwards LER 79-083/03L-0
Date released: 09/25/2019 Download: ML19254D917


LER 79-083/03L-0:on 791003,while Performing Instrument Sys Isolation Valve Cycling Test,Valves X59B,X61A & X74A Failed.Caused by Inoperable Limit Switch Button.Parts Readjusted & Replaced
ML19254D929
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 10/25/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19254D929 (1)
Forwards LER 79-083/03L-0
ML19254D916
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 10/25/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19254D916 (1)