ML19254D843

From kanterella
Jump to navigation Jump to search
Forwards LERs 79-131/03L-0 & 79-132/03L-0
Date released: 09/25/2019 Download: ML19254D843


LER 79-132/03L-0:on 790928,containment Isolation Valve, Charging Pump & Trip Valve Did Not Function as Expected During Safety Injection Functional Test.Cause Unknown. Equipment Will Be Repaired & Checked
ML19254D850
Person / Time
Site: North Anna Dominion icon.png
Issue date: 10/25/1979
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19254D850 (2)
LER 79-131/03L-0:on 790926,emergency Diesel Generator 1H Tripped During Manual Start to Verify Operability.Possibly Caused by Accumulation of Air in Fuel Filter.Diesel Was Restarted & Cause Is Being Further Investigated
ML19254D846
Person / Time
Site: North Anna Dominion icon.png
Issue date: 10/26/1979
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19254D846 (2)
Forwards LERs 79-131/03L-0 & 79-132/03L-0
ML19254D842
Person / Time
Site: North Anna Dominion icon.png
Issue date: 10/25/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19254D842 (1)