ML19254D581

From kanterella
Jump to navigation Jump to search
Requests Preparation of Solid Waste Process Control Program & Tech Specs Which Discuss Solidification of Waste
ML19254D581
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 10/09/1979
From: Reid R
Office of Nuclear Reactor Regulation
To: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
References
NUDOCS 7910290108
Download: ML19254D581 (2)


Text

g, -, e - F B_

y.

a a8%,

[e o

UNITED STATES

! %(w y',%

NUCLEAR REGULATORY COMMISSION E

WASHINGTON, D. 2. 205S5

'%. *....o#

October 9, 1979 Dockets Nos. 50-313 and 50-368 Mr. William Cavanaugh, III Vice Prr.sident, Generation and '.onstruction P. O Box 551 Litcle Rock, Arkansas 72203

Dear Mr. Cavanaugh:

By letter dated June 13, 1979, we requested that you submit your solid waste process control program (SWPCP) and Technical Specifications (TS) which address solidification of waste for Arkansas Nuclear One, Unit 1 (AN0-1).

In our tel; phone conversation with your Mr. David Mardis and Mr Steve Pitzel on July 2,1979, we indicated that we would address your except1 'ns con-cerning TS for solidification which you expressed in your letter Jated March 9, 1979.

In your Final Safety Analysis Report (FSAR) for ANO-2 you conmitted to solidify radioactive waste from Units Nos.1 and 2 in the plant solid radio-active waste system. We found your system acceptable and this supported the basis for which you were issued an operating license for Unit 2.

We do not see the inclusion of TS and a SWPCP in the license to be superfluous and unnecessary. Rather we consider that they should be included to pro-vide assurance of the implementation of your radwaste solidification program and thus to protect the health and safety of the public.

We take this position since the NRC is obligated to the states which have burial sites to assure that the solid waste shipped to the burial grounds are of acceptable quality.

The TS will provide that assurance.

To assist you in prepat ing tae SWPCP, by letter dated August 6,1979, we provided you guidarce.

Also, by letter dated August 6,1979, we provided a copy of NUREG 0472, Revision 2 which contains example Radiological Effluent TS.

You are requested to submit a SWPCP in accordance with the guidance given in our letter of August 6,1979 and radwaste :;olidification for ANO-l and ANO-2 TS like that indicated in Section 3.11.3.1 of NUREG 0472, Revision 2.

Sincerely, g

Y h' !

/

Robert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors cc:

See next page

]}"7j

'jq z

7910290 /0

Arkansas Power & Light Company cc:

Phillip K. Lyon, Esq.

House HP,ms & Jewell 1550 Toner Building Little Rock, Arkansas 72201 Mr. David C. Trimbie Manager, Licensing Arkansas Power & Light Company

-P. O. be. 551 Little.ock, Arkansas 72203 Mr. James P. O'Hanlon General Manager Arkansas Nuclear One P. O. Box 608 Russellville, Arkansas 72801 Mr. William Johnson U. 5. Nuclear Regulatory Commission P. O. Box 2090 Russellville, Arkansas 72801 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division Suite 420, 7735 Old Georgetown Road Betnesda, Maryland 20014 Troy B. Conner, Jr., Esq.

Conner, Moore & Corber 1747 Pennsylvat.ia Avenue, N.W.

Washington, D.C.

20006 Arkansas Polytechnic College Ru.sellville, Arkansas 72801

!22l 3}6

'