b UNITED STATES
('
f g
y g
NUCLEAR REGULATORY COMMISSION
/b p
WASHING TON,0. C. 20555
- r
's, ? * * * *,o F
OCT 0 9 1979 e
MEMORANDUM FOR:
Olan D. Parr, Chief Light Water Reactors Branch No. 3, DPM FROM:
Robert E. Jackson, Chief Geosciences Branch, DSS
SUBJECT:
MOISTURE CONTROL OF AUXILIARY DAM CC9E AB0VE ELEVATION 225 FT.
PLANT NAME: Shearon Harris, Units 1-4 LICEf1 SING STAGE: Post CP DOCKET NUMBERS: 50-400/403 MILESTONE NUMBER: R-18 RESPONSIBLE BRANCH:
LWR-3; S. Miner, LPM REVIEW STATUS: Auxiliary Dam - Complete In a letter from M. A. McDuffie, CP&L to H. Denton, NRR, dated September 29, i
1979, the applicant submitted a design change notification, DCN-550-347, which changes the moisture control requirements in the core of the west auxiliary dam. Whereas the specifications previously required all moisture contents to be within - 2% to +2% of optimum moisture content, the DCN requires the moisture content to be within
.1% to +3% of optimum moisture content at elevations above 225 ft.
We have reviewed this submittal by the applicant and we approve this change. This review was made by Dr. Owen Thompson, Geotecnical Engineering Section, GB, DSS.
w<xm $ Y
/$r-Robert E. Jackson, Chief Geosciences Branch Division of Systems Safety cc:
K. Schroeder L. Heller J. Knight S. Miner S. Varga A. Cardone R. Shewmaker
- 0. Thompson C. Murphy F. Williams T. Conlon PDR
/
R. Bradley Local PDR J. Lenahan J. Harris R. Jacksor 1209 321 1/4*C 7910350