e cq f

g UNITED STATES

(

g NUCLEAR REGULATORY COMMISSION E.E A{

REGION IV G11 RYAN PLAZA DRIVE, SUITE 1000 D

,o'g 4

V ARLINGTON, TEXAS 76012 4 *.,**

16 JUL 1979 Docket No.

99900003/79-02 General Electric Company Wilmington Manufacturing Departuent ATTN:

Mr. R. J. Alkema General Manager Box 780 Wilmington, North Carolina 28401 Centlemen:

This refers to the QA Program inspection conducted by Mr. W. M McNeill of this office on June 4-7, 1979, of your facility at Wilmington, North Carolina, associated with the manufacture and fabrication of nuclear fuel assemblies and to the discussions of our findings with Mr. C. W. Doyle and members of your staff at the conclusion of the inspection.

This inspection was made to confirm that, in the areas inspected, your QA Program is being effectively implemented. The inspection effort is not designed to assure that unique quality requirements imposed by a customer are being implemented; nor to. assure-that a specific product, component or service pro-vided by you to your customers, is of acceptable quality.

As you know, the NRC requires each of its licensees to assume full responsibility for the quality of specific products, components or services procured from others. You should therefore not conc.lude that the NRC's inspection exempts yot' from inspections by an NRC licensee or his agents nor from taking effective corrective action in response to their findings.

Areas examined and our findings are discussed in the enclosed report. Within these areas. the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

During the inspection it was found that the implementation of your QA Program failed to meet certain commitments in your Topical Report, NED0-11209-04A. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.

Please provide us within thirty (30) days of your receipt of this report a written statement containing, (1) a description of steps that have been or will be taken to correct these items, (2) a description of steps that have been or will be taken to prevent recurrence, and (3) the date your corrective actions and preventive measures were or will be completed. b L 7910170b PMf!!9f;...

General Electric Company In accordance with Section 2.790 of the Commission's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter with enclosure and your reply, together with the enclosed inspection report will be placed in the Commission's Public Document Room. If this report conLains any information that you believe to be proprietary, it is necessary that you make a written application within thirty (30) days to this of fice to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of Ohich it is claimed that the information is proprietary, and should be prepared so that proprietary informa-tion identified in tha application is contained in a separate part of the docunent. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room. Should you have any questions concerning this luspection, we will be pleased to discuss then with you. Sincerely, f ~ r J L, b /N Uldis Potapovs, Chief i Vendor Inspection Branch -u v r

Enclosures:

1. Notice of Deviation 2. Inspection Report No. 99900003/79-02 cc: General Electric Company Attn: W. A. Anders General Mhnager Nuclear Energy Products Division 175 Curtner Avenue San Jose, California 95125 11E' q 'l 7 I IJO vcc .}}