Forwards IE Bulletin 79-23, Potential Failure of Emergency Diesel Generator Field Exciter Transformer. Action Required
ML19254B328
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 09/12/1979
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Millen C
PUBLIC SERVICE CO. OF COLORADO
References
NUDOCS 7909270321
Download: ML19254B328 (1)


Text

CEllTRAL FILES ge acc NiiED STATES oq'o, NUCLEAR REGULATORY COMMISSION PR PDR:HQ

.l' 'W REGION IV Q I.

V F, y,g' [.;,,b j ARLINGTON, TEX AS 76012 no 611 RYAN PL AZA DRIVE. SUITE 1000

,,b M

?. ~b; 6.. l*;{, $

N.,,,.*

September 12, 1979 Docket No. 50-267 Public Scrvice Company of Colorado ATTN:

Mr. C. K. Millen Senior Vice President P. O. Box 840 Denver, Colorado 80201 Gentlemen:

Enclosed is IE Bulletin 79-23 uhich reviires action by you with regard to your power reactor facility with an operating license or a construction permit.

Should you have questions regarding this IE Bulletin or the actions required of you, please contact this office.

a.

Sincerely,

./#

-j,. '

  • 1-

-s Karl V. Seyfrit Directir

Enclosures:

L.

IE Bulletin No. 79-23

'l.

List of IE Bulletins Issued in the Last Six Months c::

D. W. Warenbourg, Nuclear Production Manager Fo r t S t. Vrain Nuclear Station P.

O. Box 368 Platteville, Colorado 80651 L. Brey, Manager, Quality Assurance 1046 068 7900270 }f

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT g q()g,g,010 WASHINGTON, D.C.

20555 pf IE Bulletin No. 79-23 Date:

Septec.ber 12, 1979 Page 1 of 3 POTENTIAL FAILURE OF EMERGENCY DIESEL GENERATOR FIELD EXCITER TRid4SFORMER Description of Circumstances:

Florida Pawer and Light Company recently reported a problem encountered during a 24-hour full load test of the emergency diesel generators (EDG) at their Turkey Point facility. Approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> into the test, the A-EDG tripped due to a differential-relay lockout on B and C phases; the B-EDG was manually stopped, thus interrupting the test at that point in time.

Subsequent investigation and testing by the licensee revealed a design error on both the A and B EDGs which resulted in overheating of the Exciter Power Transformers (EPTs) at ustained high load operation.

The following nameplate data applies to the equipment installed at Turkey Point:

Emergency Diesel Generator General Motors (Electro-Motive Division)

Model EMD-999-20 Engine-turbochtrged, 2 cyc1e, EMD design 20-645E4 Generator-EMD-design Model A-20 Exciter Power Transformer GE-single phase Model-9T24Y1004 Serial-MD Cycles-60 KVA 15 Insulation-4160 V The manufacturer's findtags and recommendations regarding the cbove problem are described below:

"A potential problem can exist if t DUPLICATE DOCUMENT the primary windings of the excitat to as the control power transformer Entire document previous 1 entered into system under 1046 069