Forwards IE Bulletin 79-23, Potential Failure of Emergency Diesel Generator Field Exciter Transformer. Action Required
ML19254B327
Person / Time
Site: Fort Calhoun 
Issue date: 09/12/1979
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Jones
OMAHA PUBLIC POWER DISTRICT
References
NUDOCS 7909270320
Download: ML19254B327 (1)


Text

CENTRAL FILES UNITED STATES PDR:HQ j F'o Pic %

NUCLEAR REGULATORY COMMISSION n

o 7 '.A.

REGION IV n

611 RY AN PLAZA DRIVE SUITE 1003 7

ih's

, %;f'[ 'i [

ARLINGTON, TEX AS 76012

[j$lC o

o _,>ru,Ln

, c-Sep tember l2,1979 Docket No. 50-285 Omaha Public Power District ATTN:

W. C. Jones, Division Manager -

Production Operations 1623 Harney Street Omaha, Nebraska 68102 Gentlemen:

Enclosed is IE Bulletin 79-23 which requires action by you with regard to your power reactor facility with an operating license or a construction permit.

Should you have questions regarding this IE Bulletin or the actions required of you, please contact this office.

=,

Sincerely,

/.

l -/*

/g

, p/.

, ',(

'- v' Karl V. Seyfrit

,l Director

Enclosures:

1.

IE Bulletin No. 79-23 2.

List of IE Bulletins Issued in the Last Six Months cc:

S. C. Stevens, Manager Fort Calhoun Station Post Office Box 98 Fort Calhoun, Nebraska 68102

'1046 066 79092703

UNITEP GTATES NUCLEAR REGUU

  • 0RY COMMIl:SION OFFICE OF INSPECTluJ A10 EHFORCDIENT WASHINGTON, D.C.

20355 IE Bulletin No. 79-23 Da t.c : September 12, 1979 Page 1 of 3 POTENTIAL FAILURE OF EMERGENCY DIESEL GEtFf]ATOR TIELD EXCITER TRANSFORMER Description of Circumstances:

Florida Power and Light Company recently reported a proble:s encountered during a 24-hour full load test of the emergency dier.el generators (EDG) at their Turkey Point facility. Approximately 10 hourr; into the test, the A-EDG tripped due to a differential-relay lockout on B.r4 C phases; the B-EDG was manually stopped, thus interrupting the test at the. point in time.

Subsequent investigation and testing by the licen :ce revealed a deaign error on both the A and B EDGs which resulted in werheating of the Exciter Power Transformers (EPTs) at sustained high load operation.

The following nameplate data applies to tLe equipment installed at Turkey Point:

Emergency Diesel Generator General Motors (Electro-Motive Division)

Model EMD-999-20 Engine-turbocharged, 2 cycle, EMD design 20-645E4 Generator-EMD-design Model A-20 Exciter Pouer Transformer GE-single phase Model-9T24Y1004 Serial-MD Cycles-60 KVA 15 Insulation-4160 V The manufacturer's findings and recommendationc regarding the above problem are described below:

"A potential problem can exist if the n the primary windings of the excitation I DUPLICATE DOCUMENT to as the control power transformer (CP1 Entire document previously entered into system under: