Forwards IE Bulletin 79-23, Potential Failure of Emergency Diesel Generator Field Exciter Transformer. Action Required
ML19254B322
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/12/1979
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Koester G
KANSAS GAS & ELECTRIC CO.
References
NUDOCS 7909270312
Download: ML19254B322 (1)


Text

..,

e a

o UNITED STATES O 'f na[c,]o p

NUCLEAR REGULATORY COMMISSION

/

,n R ECloN IV

$ I Q

o 611 RY AN PLAZA DRIVE, SUITE 1000 j

A RLINGToN, TEX AS 76012 P, ( '

O

~

s.,-

/

September 12, 1979 In Reply Refer To:

RIV Docket No.

STN 50-482/IE Bulletin No. 79-23 Kansas Gas & Electric Co.

Atta:

Mr. Glenn L. Koester Vice President-Operations Post Office Box 208 Wichita, Kansas 67201 Gentlemen:

Enclosed is IE Bulletin 79-23 which requires action by you with regard to your power reactor facility with an operating license or a construction permit.

Should you have questions regarding this IE Bulletin or the actions required of you, please contact this office.

Sincerely, Wed$;b '

Karl V. Seyfrit Director

/

Enclosuree:

1.

IE Bulletin No. 79-23 2.

List of IE Bulletins Issued in the Last Six Months cc: w/ enclosures Messrs. Nicholas A. Petrick, SNUPPS D. T. McPhee, Kansas City Power and Light Company Gerald Charnoff, Shaw, Pittman, Potts & Trowbridge E. W. Creel, Kansas Gas and Electric Company 1046 058 7909270}

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 IE Bulletin No. 79-23 Date:

September 12, 1979 Page I of 3 POTENTIAL FAILURE OF EMERGENCY DIESEL GENERATOR FIELD EXCITER TRANSFORMER Description of Circumstances:

Florida Power and Light Company recently reported a problem encountered during a 24-hour full load test of the emergency diesel generators (EDG) at their Turkey Point facility.

Approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> into the test, the A-EDG tripped due to a differential-relay lockout on B and C phases; the B-EDG uas manually stopped, thus interrupting the test at that point in time.

Subsequent investigation and testing by the licensee revealed a design error on both the A and B EDGs which resulted in overheating of the Exciter Power Transforr.ers (EPTs) at sustained high load operation.

The following nameplate data applies to the equipment installed o? Turkey Point:

Emergency Diesel Generator General Motors (Electro-Motive Division)

Model EMD-999-20 Engine-turbocharged, 2 cycle, EMD design 20-645E4 Generatar-EMD-design Model A-20 Exciter Power Transformer GE-single phase Model-9T24Y1004 Serial-MD Cycles-60 KVA 15 Insulation-4160 V The manufacturer's findings and recommendations regarding the above problem are described below:

atew== :e=w.= :: ;=,, _..

"A potential problem can exist if the the primary windings of the excitatioi DUPLICATE DOCUMENT to as the control power transformer (t Entire document previously entered into system under:

ANO

-/ 0722d/ 0V No-of vases:

Y 1044 059

_