Forwards IE Bulletin 79-23, Potential Failure of Emergency Diesel Generator Field Exciter Transformer. Action Required
ML19254B321
Person / Time
Site: South Texas  
Issue date: 09/12/1979
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Eric Turner
HOUSTON LIGHTING & POWER CO.
References
NUDOCS 7909270311
Download: ML19254B321 (1)


Text

.

o UNITED STATES

[Sa R'c,#'o,$

NUCLEAR REGULATORY COMMISSION yN

  • /

REGlcN IV l

I o 611 RYAN PLAZ A DRIVE,0,UITE 1000

'[

ARLINGTON, TEXAS 76012

$*g) o ?

  1. p s

h Septexter 12, 1979 g

In Reply Refer To:

RIV Dochet Nos. 50-498/IE Bulletin No. 79-23 50-499/IE Bulletin No. 79-23 Houston Lighting & Power Co:npany ATTN:

Mr. E. A. Turner, Vice President Power Plant Construction and Technical Servicco Post Of fice Box 1700 Houston, Texas 77001 Centlemen:

Encloaed is IE Bulletin 79-23 which rm ires action by yoit with regard to your power reactor facilities with an operating license or a construction permit.

Should you have questions regarding this IE Btfletin or the actions required of you, please contact this office.

Sincerely,

(

?l~/

pf j[GP'Jk

,X V. Seyfrit Dircctor l

Enclosures:

1.

IE Bulletin No. 79-23 2.

L st of IE Balletins issued in the Last S.ix Monthe 1046 056 r

j 790927 I

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 IE Bulletin No. 79-23 Date:

September 12, 1979 Page 1 of 3 POTENTIAL FAILURE OF EMERGENCY DIESZL GENERATOR FIELD EXCITER TRANSFORMER Description of Circumstances:

Florids Power and Light Company recently reported a problem encountered during a 24-hour full load test of the emergency diesel generators (EDG) at their Turkey Point facility. Approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> into the test, the A-EDG tripped due to a differential-relay lockout on B and C phases; the B-EDG was mar.ually stopped, thus interrupting the test at that point in time.

Subsequent investigation and testing by the licensee revealed a design error on both the A and B EDGs which resulted in overheating of the Exciter Power Transformers (EPTs) at sustained high load operation.

The following nameplate data applies to the equipment installed at Turkey Point:

Emergency Diesel Generator General Motors (Electro-Motive Division)

Model EMD-999-20 Engine-turbocharged, 2 cycle, EMD design 20-645E4 Generator-EMD-design Model A-20 Exciter Power Transformer GE-single phase Model-9T24Y1004 Serial-MD Cycles-60 KVA 15 Insulation-4160 V The manufacturer's findings and recommendations regarding the above problem are described below:

"A potential problem can exist if the ne

' ' ~~ '-

the primary windings of the excitation p DUF. MTE DOCUMENT to as the control power transformer (CPT Entire cocument previously entered into system under:

ANO D [2.2d[d No. of pages: