Ack Receipt of Re Discharge of Radioactive Wastes from TMI Into Susquehanna River.Summarizes Status of Safety Review & Environ Assessment.Review Results Will Be Made Public
ML19254B088
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/15/1979
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Slap A
MINNEY, MECUM & KOHR
Shared Package
ML19254B089 List:
References
NUDOCS 7909240277
Download: ML19254B088 (2)


Text

..

y y,p $ n _

g.

g.

47

~

' d J} dUEf M AUG~ 151979 i

3

~

i Mr Albert J. Slap [ Esquire

~

}

Minney, Mecum FKohr Attorneys and' Counsellors at Law r

i 121 East King Street

[

Lancaster, PA 17602..

t

~

j

Dear Mr. Slap:

I apologize for not providing this response to you sooner but, a's you are aware, the Commission and staff have been occupied with continued support.of the efforts a't Three itile Island, Orders to other facilities,

~

appearances before the President's Commission and various committees of Congress that are investigating the Three Mile Island accident,-and the

(

realignme.c of our own resources and priorities to give immediate atten-j tion,to the problems resulting from the accident.

1 On May 25, 1979, the Nuclear Regulatory Commission directed its staff to prepare an Environmental Assessment of proposals to dacontaminate and

. dispose of radioactively contaminated waste water from the Three Mile' j

c Island Unit.2 facility (TMI). The first. portion of the Assessment will 7

deal with the proposed decontamination of the intermediate level waste-water using the EPICOR-II system at TMI. The Assessment will include 1

r discussions of potential. r~1sks to the public' health ~and safety, including j

occupational exposures and the risk of-accidental releases, and a discus-sion of alternatives to the EPICOR-II system. The licensee has been directed by the Commission not to operate the'EPICOR-II system, pending

~

completion of this portion of the Assessment and opportunity for public comment. However, testing. of the EPICOR-II systen without using con-taminated waste may proceed.

Furthermore, except for. Ipcharge of waste water decontaminated by ph'e 2

existing EPICOR-I system _1 and discharge-of industrial waste waterd as consistent with the facil-ity operating license, no discharge of processed intern"tdiate level waste. water will be permitted until completion of a second portion of the Assessment -dealing with any such proposed additional l

discharges. This portion will include a discussion of alternatives to i

discharge into the Susquehanna River.

7909240 g

.l./Primarily pre-accident waste wate'r frbm Unit 1 which has b'een partially

~

contaminated by water from Uni.t 2, with an activity level of less than l microcurfe per ml prior-to treatment and with an activity level approxi-ma t el y 1rf-nicy,c,irios car r11 in *ho riise b rgo canal after treatment.

'"E7a:te water"sitgTtly rentamimted-(approximtely 10~I nic"ocuries-per-nl.). - ~ ~ ~ ~ ~ ~ -

ekst.to.. leakage..f wo.. secondary.. plant...s.er.Y. ice. supp.or.t..sys.tn as.....Th.c..d.is-s.ge of this 11dustrial waste water is nec essary to maiitain TMI Unit 2

chs r

==g

.. s. m...,,

ym...............

.c-m -

992

.147

~-

O N

J0JJ

%g v.

s 2.

\\,_s10. y T g

o g'p b.3. L

=

Mr. Albert J. Slap. :

g

~

-4 The decontamination and disposal of high-level waste sater willebe the

-]

sub. ject of a subsequent Assessment. When completed', a copy of each.

Asssessment prepared on this matter will be made available to the public.

Of prime consideration in'the matter of.THI liquid waste processing, as s

in all matters for which we have responsibility, is the health and safety 3

of the public. The course of action-that.we are following, as described above, will assure that a thorough safety review and Environmental

~q

~

Assessment' are completed and that the. health and safety of all off-site

~'.

population groups.will be protected.

Sincerely,

'.~.

)

Original signed by.

3 j

E G. Case arol'd-R. Denton, Director

' Office of Nuclear Reactor Regul'ations 8

.-t DISTRIBUTION -

^

~

Docket file 50-3'20 i

~

3 NRC PDR.

~

LPDR

'l HRDenton' l

1 l

EGCase c

~

LVGossick --

MGroff- (ED0-6415) 4 GErtter(ED0-6315)

PSS R/F P-433

~

l VStello

~

NHaller DMCrutchfield: -

'j TRehm HShapar 7 j s/h h iI.

l

)

l1

)

(

NRR: M

.O d

...'j r l

i F

ams EGCase H <

tn i

swamass >

..........x............

I 8-

-79

.........D.. 7 9 8-8-

-79 I

~

1!ru.s.eeven nsentpassmneseweseseeve ses ***

Nec reent He (9 74 NEdB4 0840 992 348

O 1 p a JL

]

~

a JU

. S

. L 2

s n

FROM:

ACTION CONTROL DATES CONTROL N g

gg gg g

COMPL DEAOLINE

@ /[$

U g

j ga ggg ACKNOWLEDGMENT DATE OF DOCUMENT e

1..e e s e Pw Da INTERIM REPLY TO: ' ' ' ' ' '

G2[]

PREPARE FOR SIGNATURE O F '-

ggg jgjg FINAL REPLY /[/

/

g CHAIRMAN FILE LOCATION /

O EXECUTIVE DIR ECTOR

/

/

OTHER:

D ESCRIPTION O LETTER O MEMO O REPORT O OTHER SPECIAL INSTRUCTIONS OR REMARKS As representative of private citizens &

citizeus' grou;;s, urges the Federal government to prshibit discharge of TAI highlevel waste into the Sr:r== & advises citizens wil l go to court if dumping appedr9 faminent CLASSIFIED DATA OOCUMENT/ COPY NO.

CLASSIFICATION NUMBER OF PAGES CATEGORY POSTAL REGISTRY NO.

O NSi O Ro O fro SECY 79-15E2 ASSIGNED TO:

DATE INFORMATION ROUTING LEGAL REVIEW O Ff NAL C

C'. 'Y t

finban 8i/31/79 $gg$ick kaR ASSIGNED TO:

OATE lO jYAL C8JECTIONS T

Cartwil Davis O EoO AouiNa CORaES ea EXT.

Ma))y COM M ENTS. NOTlF Y:

b d

EXT.

1--

n gag JCAE NOTIFICATICN RECOMMENDED:

O VES O NO NRC FORM 232 EXECUTIVE CIRECTOR FCR CPERATIONS 00 NOT REMOVE THIS COPY PRINCIPAL CORRESPONDENCE CONTROL 4

992 349

N o.

. Logging Date 5/28/79 NRC SECRETARIAT TO: O Commissioner oate UMmec. Dir./Oper.

O Gen. Counsee O Cong. Liaison O Sonetor O Public Affairs O Secretary O

imom no: Albert J. Slao, and other attorneys _

From:

t.aw Firm of Minney. Mecum & Kohr Iancaster. PA To: rhaiman Hondria Date 5/23/79

Subject:

Ifrnac NRF nnt tn nemit dumnino of TMI generated h ch-level waste'into suSquehanna K1Ver.

h. Prepare reply.for signature of:

O. Cnainn.n Commessioner

)(h EDO, GC, CL, SOL, PA, SECY O signature biocx omitted

)

O O Retum ongmai os incoming.itn response Suspense: June 8 For direct repiy

  • For appropriate acte O Forinformaten F.::'d C '

ccu,,f' 700 Forr w-....

uta Tu, na..j g

,.o

9. 9.:e...:..:.

3 g Cpy: X2K PA

..com,,,,,,,,,

For the Commission:

garry

' Send three (3) copees of reply to Secy Mail Facility mac42 ACTION SLIP 992 350