o e

gf'o

/(

n arco o,

UNITED STATES y})

g NUCLEAR REGULATORY COMMISSION

. _\\ u

./ - r REGION 111 oI 799 ROOSEVELT ROAD o

GLEN ELLYN, ILLINOls 60137 g{p 7 gg7g Docket Nos. 50-10, 50-237, 50-249, 50-254, 50-265, 50-295, 50-304, 50-373, 50-374, 50-454, 50-455, 50-456 and 50-457 Commonwealth Edison Company ATTN:

Mr. Byron Lee, Jr.

Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

The enclosed supplement to IE Bulletin No. 79-14 is forwarded to you to provide added guidance on the intent of the Bulletin.

If you desire additional information regarding this matter, please contact this office.

Sincerely, M.S N VJames G. Kepp er Director

Enclosure:

Supplement 2 to IE Bulletin No. 79-14 cc w/ enc 1:

Mr. B. B. Stephenson, Mr. R. Cosaro, Project Station Superintendent Superintendent Mr. N. Kalivianakis, Central Files Station Superintendent Director, NRR/DPM Mr. N. Wandke, Station Director, NRR/ DOR Superintendent PDR Mr. L. J. Burke, Site Local PDR Project Superintendent NSIC Mr. T. E. Quaka, Quality TIC Assurance Supervisor Anthony Roisman, Esq.,

Mr. R. H. Holyoak, Station Attorney Superintendent Mr. Dean Hansell, Office tir. Gunner Sorensen, Site of Assistant Attorney Project Superintendent General f

}

7999240093

(,o7

8 SSINS:

6820 Accesstion No.: 7908220109 g

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 September 7, 1979 IE Bulletin No. 79-14

~

Supplement 2

~

SEISMIC ANALYSIS FOR AS-BUILT SAFETY-RELATED PIPING SYSTEMS Description of Circumstances:

IE Bulletin No. 79-14 was issued on July 2, revised on July 18, and first supplemented on August 15, 1979.

The bulletin requested licensees to take certain actions to verify that seismic analyses are applicable to as-built plants.

Supplement 2 provides the following additional guidance with regard to implementation of the bulletin requirements:

Nonconformances One way of satisfying the requirements of the bulletin is to inspect safety-related piping systems against the specific revisions of drawings which were used as input to the seismic analysis.

Some architect-engineers (A-E) however, are recommending that their customers inspect these systems against the latest revisions of the drawings and mark them as necessary to define the as-built configuration of the systems. These drawings are then returned to the AE's offices for comparison by the analyst to the seismic analysis input.

For licensees taking this approach, the seismic analyst will be the person who will identify nonconformances.

The first supplement to the bulletin provided guidance with regard to evaluation of nonconformances. That guidance is appropriate for licensees inspecting against later drawings.

The licensee should assure that he is promptly notified when the AE identifies a nonconformance, that the initial engineering judgment is completed in two days and that the analytical engineeriag evaluation is completed in 30 days.

If either the engineering judgemert or the analytical engineering evaluation indicates that system operability is in jeopardy, the licensee is expected to meet the applicable technical specification action statement.

Visual Approximations Some licensees are visually estimating pipe lengths and other inspection elements, and have not documented whict hat wa.

Visual estimation of dimensions is not where visual estimates are used, the ac DUPLICATE DOctTMENT ante requirements.

Further, in documer ically identify those data that were v

{ntiredocume

.eviously entered 6

^= 79 OER 20/o9 No. of pages:

_..