ML19254A651

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-10, Requalification Training Program Statistics. Written Response Required
ML19254A651
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/11/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Clayton F
ALABAMA POWER CO.
References
NUDOCS 7906110058
Download: ML19254A651 (1)


Text

[6-34 UNITED ST ATES enarou

'o NUCLEAR REGULATORY COMMISSION 114.q/.4 nEcioN n

[ ' 3.,.

g 101 M ARIETT A STRE ET, N.W.

,t

.g-8 ATLANT A, GEORGIA 30303

.f.

'% * ** * [

y d 1,1 397 9 In Reply Refer To:

RII:JPO 50-348 Alabama Power Company Attn:

Mr. F. L. Clayton, Jr.

Senior Vice President Post Of fice Box 2641 Birmingham, Alabama 35291 Gentlemen:

A The enclosed Bulletin 79-10 is forwarded to you for action.

written response is required.

If you desire additional information regarding this matter, please contact this office.

Sincerely, Jaces P. O'Reilly IN Director

Enclosures:

1.

lE Bulletin No. 79-10 2.

List of IE Bulletins Issued in Last Twelve Months

~.

7906110D6T-9

flE,Y l 11979

. Alabama Power Company cc w/ enc 1:

A. R. Barton Executive Vice President Post Office Box 2641 Birmingham, Alabama 35291 C. Biddinger, Jr.

Manager-Corporate Quality Assurance Post Office Box 2641 Birmingham, Alabama 35291 H. O. Thrash Manager-Nuclear Generation Post Office Box 2641 Birmingham, Alabama 35291 H. G. Hairston, III Plant Manager Drawer 470 Ashford, Alabama 36312 R. E. Hollands, Jr.

QA Supervisor Post Office Box U Ashford, Alabama 36312 I

e 0

0

t UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT b'ASHINGTON, D.C.

20555 May 11, 1979 IE Bulletin No. 79-10 REQUALIFICA'110N TRAINING PROGRAM STATISTICS Description of Circumstances:

Because of the apparent f ailure of the operators at Three Mile Island to recognize certain plant conditions and take appropriate action to effec-tively cool the core and contain fission products after release from the the NRC Commissioners are evaluating licensee's requalification

core, As one element in this evaluation, the NRC is training programs.

interested in obtaining statistics about the failure rate on the annual The information requested below along requalification examinations.

with other information will then be used to evaluate the effectiveness of the operator requalification training program.

Action to be Taken by Licensees:

For all power reactor f acilities with an operating license.

Provide both the total nu=ber and percentage of operators who 1.

have failed the annual requalification examination.

Provide the percentage of those operators who take the annual 2.

requalification examination and are required to attend lectures on categories of material for which they received a grade of Also provide the total nu=ber of supple-less than 80 percent.

cental lectures attended (e.g., 3 operators had to attend 2 lectures, 1 operator had to attend 3 lectures, etc.).

Provide both the total number and percentage of operators under 3.

the requalification program that participated in accelerated training because they either scored less than 70 percent overall on the annual written examination or had an unsatisf actory performance on the oral examination.

Provide the same information required by 1 thru 3 on Senior 4.

Operators.

i, DUPLICATE DOCUMENT Entire document previously entered into system under:

~77 67/6c6 ANO i

g g

No. of pages:

-..