ML19253D054
| ML19253D054 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 12/03/1979 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Hines E DETROIT EDISON CO. |
| Shared Package | |
| ML19253D055 | List: |
| References | |
| NUDOCS 7912120556 | |
| Download: ML19253D054 (1) | |
See also: IR 05000341/1979018
Text
e
pm "800g
UNITED STATES
,,
NUCLEAR REGULATORY COMMISSION
o
R EGION itt
'
5
'f
799 ROOSEVELT ROAD
g
/
G LEN ELLYN, ILUNOIS 60137
Docket No. 50-341
DEC 3}9J9
The Detroit Edison Company
ATTN:
Mr. Edward Fines, Assistant
Vice President and Manager
Quality Assurance
2000 Second Avenue
Detroit, Michigan 48226
Gentlemen:
Thank you for your letter dated November 21, 1979, informing us of the
steps you have taken to correct the items of noncompliance which we
brought to your attention in Inspection Report No. 50-341/79-18 for-
warded by our letter dated October 16, 1979. We will examine these
matters during a subsequent in,spection.
Your cooperation with us is appreciated.
Sincerely,
i
G. Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
cc w/1tr dtd 11/21/79:
Central Files
Reproduction Unit NRC 20b
Local PDR
Ronald Callen, Michigan Public
Service Commission
Eugene B. Thomas, Jr.,
Attorney
1541
504
.~ 9 1 2 1 2 0 5 5 4