ML19253C968
| ML19253C968 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 10/10/1979 |
| From: | Stallings C VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19253C969 | List: |
| References | |
| 992, NUDOCS 7912120449 | |
| Download: ML19253C968 (3) | |
Text
,
VIRGINIA ELECTRIC AND POWER C OM PANY HICIIMOND,YIROINIA 20261 December 10, 1979 Mr. Harold R. Denton, Director Serial No. 992 Office of Nuclear Reactor Regulation LOA /WRM:shs Attn:
Mr. A. Schwencer, Chief Operating Reactors Branch No.1 Docket No. 50-338 Division of Operating Reactors U. S. Nuclear Regulatory Commission License No. NPF-4 Washington, DC 20555
Dear Mr. Denton:
MODIFICATION TO AMENDMENT TO OPERATING LICENSE NPF-4 NORTH ANNA POWER STATION UNIT NO. 1 TECHNICAL SPECIFICATION CHANGE NO. 23 By a letter dated October 25, 1979, we requested a change to the Technical Specifications for North Anna Power Station Unit No. 1.
These changes were designated as Proposed Technical Specification Change No. 23.
It has come to our attention that a modification to our original change proposal is needed.
FSAR Section 3.1.49 and 10CFR50 Appendix A, Criterion 56.4 require one autonatic valve inside and one automatic valve outside the containment for i sola tion.
1-l A-55 is a check valve and qualifies as an automatic valve inside the containment. Since TV-IA-102B is the closest automatic valve to the contain-ment, it is the automatic valve outside the containment. These two valves together form the isolation boundary and therefore must be listed in Table 3.6-1.
Valve TV-102A will not serve as an isolation valve, and should not be included in the table.
This request has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the System Nuclear Safety and Operating Committee.
It has been determined that this request does not pose an unreviewed safety question, as defined in 10CFR50.59.
1536 351 79121209If
Vano wrA EtzcTaic Axp Powra COMPANY TO Mr. Harc,.d R. Denton 2
We have evaluated this request in accordance with the criteria in 10CFR170.22. Since this request is a modification of a proposed change which is currently under your review, an additional amendment fee is not necessary.
Very truly yours,
,J
<(f, p/ / d ht((sss<y y
C. M. Stallings Vice President-Power Supply and Production Operations At tacivnent 1.
Replacement pages 3/4 6-22 and 3/4 6-29 for Proposed Technical Specification Change No. 23 cc:
Mr. James P. O'Reilly, Director Office of Inspection and Enforcement Region ll 1536 552
COMMONWEALTH OF VIRGINI A
)
)
- s. s.
CITY OF RICHMOND
)
Before me, a Notary Public, in and for the City and Common-wealth aforesaid, today personally appeared C. M. Stallings, who being duly sworn, made oath and said (1) that he is Vice President-Power Supply and Production Operations, of the Virginia Electric and Power Company, (2) that he is duly authorized to execute and file the fore-going Amendment in behalf of that Company, and (3) that the statements in the Amendment are true to the best of his knowledge and belief.
Given under my hand and notarial seal this je74 day of w,s,mbst
, g.
My Commission expires
.)f,gff s v Pp >16/.
/
W[
- h Notary Public
.(SEAL) 1536 453