05000267/LER-1979-058-03, /03L-0:on 791107,during Reactor Shutdown,Line Supplying Backup Bearing Water to 1A Helium Circulator Determined to Be Impaired Due to Impaired Hanger.Caused by Missing Anchor Bolt & Stripped Anchor Bolt Shield

From kanterella
(Redirected from ML19253C908)
Jump to navigation Jump to search
/03L-0:on 791107,during Reactor Shutdown,Line Supplying Backup Bearing Water to 1A Helium Circulator Determined to Be Impaired Due to Impaired Hanger.Caused by Missing Anchor Bolt & Stripped Anchor Bolt Shield
ML19253C908
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 12/06/1979
From: Gahm J
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19253C900 List:
References
LER-79-058-03L, LER-79-58-3L, NUDOCS 7912120336
Download: ML19253C908 (1)


LER-1979-058, /03L-0:on 791107,during Reactor Shutdown,Line Supplying Backup Bearing Water to 1A Helium Circulator Determined to Be Impaired Due to Impaired Hanger.Caused by Missing Anchor Bolt & Stripped Anchor Bolt Shield
Event date:
Report date:
2671979058R03 - NRC Website

text

U.S. NUCLEAR REGULATORY COMMISSION NRC FOyM,366 (7 77)

LICENSEE EVENT REPORT CONTROL BLOCK: l l

l l

l l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

0 l@l 4 l1 l 1 l 2 l 0 l@l l

l@

l 0 l0 0l0l0l-0 o

l' C l 0 l F l S l V 1l@l0l0 7

8 9 LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE Jo 5 7 CA T Sd CCN'T

@l 0 l 5 l 0 l 0 l 0 l 2 l 6 l 7 @l 1 l 1 l 0 l 7 l 7 l 9 l@l 1 l 210 l 6 l 7 l 9 l@

" ERC L

0 1

C 7

8 60 61 COCKET Nuv8ER 68 69 EVENT DATE 74 75 REPORT DATE 83 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h o

2 lAt 1326 hours0.0153 days <br />0.368 hours <br />0.00219 weeks <br />5.04543e-4 months <br /> on November 7,1979, with the reactor in a shutdown condition, the line I tsupplying backup bearing water to lA helium circulator was determined to be i= paired I

o a

ldue to an impaired hanger 10A-H-21208. This is a degraded mode of LCO 4.3.10 and is I

o i4 l reportable per Fort S t. Vrain Technical Specification AC 7.5.2(b) 2.

No affect on l

ois o #6 health and safety of the public.

I ai7 l I

l0id 80 9 9 SYSTEM

CAUSE

CAUSE CCYP VALVE CCCE CCCE SUSCODE COMPONENT CODE SUSCOCE SUSCOCE oIa lC l Bl@ l 3 l@ l A l@ lS lU lP l0 lR lT lh A @ l Z]@

a 9

10 11 12 13

8 19 20 SECUENTI AL OCC;. A A E'.CE REFCRT CEV SfCN gga ao EVENT YE AR REPORT NO.

CCCE TYPE NO.

@ aEPORT l 7) 9l l-l l Of 5l Sl l., - l l0 l3 l Ll l-l 0l

_ 21 22 23 24 26 27 28 24 30 31 32 AK N A

ON ON PL NT v

wCURS

$8 i FOR B.

SUPPLIE VANUFACTURER lAlg Zlg l35 Zlg lJ6 Zl@l 0l 0l 0} 0l Y g l2 Nlg A lg l X 9l9l9 g 33 34 3/

40 41 4

43 44 47 CAUSE CESCRIPTION AND CCRRECTIVE ACTIONS h pause of hanger 10A-H-21208 and system impairment was a missing anchor bolt and i

o peripped anchor bolt shield. Missing bolt and defective shield were replaced and l

i i

l hanger verified operable.

l i

3 I

I l

i A

80 7

8 9 SA

% power OTHER STATUS IS RY DISCOV ERY DESCRIPTION lD@

0l0l0l@lN/A l

lCl@l Engineering Analysis of Hangers l

t 5

ACTivlTY CO TENT AMOUNT CF ACTIVITY LOCATION OF RELEASE RELEASED @OF RELEASEZ lgl N/A l

l N/A l

Zl 1 l6 7

8 9 10 11 44 45 30 PERSONNEL EXPOSURES NUM8ER TYPE CESCRIPTION s

l0l0l0l@lZl@lN/A l

i 7

PERScN~EL i~;u' RIES oESCRi,Tio~@

NUv8ER l0 l0 l0l@lN/A l

i a

80 7

9 9 11 12

. k LOSS OF OR DAMAGE To FACILITY Q tEAj TYPE OESCRIPTION

%e

[]4i

.,,J j Z l@l N/A l

i 9

7 8 9 10 80

  • SCRiPrioNO 7 912120 M [3 l :;

""C "

OE iSSuEf@lN/A l

llllllllll ll IN 2

o 68 69 80 %

7 8 9 10

/

7

//f/g J. W. Gahm (303) 785-2253 g

,, n n,;,

..... ~ ~..,.,