ML19253C819

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-329/79-19 & 50-330/79-19
ML19253C819
Person / Time
Site: Midland
Issue date: 11/26/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML19253C820 List:
References
NUDOCS 7912120172
Download: ML19253C819 (1)


See also: IR 05000329/1979019

Text

b

gf

o,

UNITED STATES

y

NUCLEAR REGULATORY COMMISSION

- ' ,

5 /-

' g

'

c

REGION lli

. . .

799 ROOSEVELT ROAD

0,

%,'

,d'

GLEN ELLYN,ILLINols 60137

<

.....

NOV 2 61979

Docket No. 50-329

Docket No. 50-330

Consumers Power Company

ATTN:

Mr. Stephen H. Howell

Vice President

1945 West Parnall Road

Jackson, MI 49201

Gentlemen:

This is in response to your letter dated October 31, 1979, informing us of the

steps you have taken to correct the items of noncompliance which we brought to

your attention in Inspection Report No. 50-329/79-19 and No. 50-330/79-19

forwarded by our letter dated October 1, 1979. After reviewing your response,

we continue to feel that the certification of quality control personnel for

the post-tensioning work was not in accordance with committed Regulatory

Guide provisions. However, the corrective action outlined in the attachment

to your response is considered an acceptable approach to resolving the matter.

An inspector will witness a reinspection of completed tendons and review the

proposed written and practical examination to be administered to the QC per-

sonnel. We will examine these matters during a subsequent inspection.

Sincerely,

(%..LfaA

@amesG.Kepp$$r

Director

cc w/ltr dtd 10/31/79:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

Ef

1539 303

Ronald Callen, Michigan Public

Service Commission

Dr. Wayne E. North

Myron M. Cherry, Chicago

192

7912120

A