ML19253C685
| ML19253C685 | |
| Person / Time | |
|---|---|
| Site: | Hatch, Vogtle |
| Issue date: | 11/26/1979 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| References | |
| NUDOCS 7912110149 | |
| Download: ML19253C685 (1) | |
Text
en nao
/
- g og'o, UNITED STATES 8
3,
[,g NUCLEAR REGULATORY COMMISSION
^
g
,r REGION li
'~ l:
o, 101 MARIETTA ST., N.W., SUITE 3100 o[
%,..br ATLANTA, GEORGIA 30333 In Reply Refer To:
_R11:JPO----,-
50-321, 50-36
=424, 5 Georgia Power Company Attn:
J. H. Miller, Jr.
Executive Vice President 270 Peachtree Street, N.W.
Atlanta, Georgia 30303 Gentlemen:
The enclosed IE Circular 79-23 is forwarded to you for your information.
No written response to this Circular is required.
If you have any questions related to the subject, please contact this office.
Sincerely, r
James P. O'Reilly Director
Enclosures:
1.
IE Circular No. 79-23 2.
List of Plants That May Have Received Defective Starter or Contactors 3.
List of IE Circulars Issued In The Last Six Months 1540 183
/
7912110 /
NOV 2 61979 Georgia Power Company.
cc w/ encl:
M. Manry, Plant Manager Post Office Box 442 Baxley, Georgia 31513 C. E. Belflower Site QA Supervisor Post Office Box 442 Baxley, Georgia 31513 K. M. Gillespie Construction Project Manager Post Office Box 282 Waynesboro, Georgia 30830 E. D. Groover QA Site Supervisor Post Office Box 282 Waynesboro, Georgia 30830 1540 184
SSINS: 6830 Accession No.:
7910250496 UNITED STATES NUCIIAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 November 26, 1979 IE Circular No. 79-23 MOTOR STARTERS AND CONTACTORS FAILED TO OPERATE Gould, Inc., Electrical Products Group, reported +o the NRC on September 11, 1979 potential defects in certain NEMA size 3, Starters and Contactors. A possible binding or seizure of the carrier assembly, within the support plate of the stationary contact assembly, is caused by an undersized dimension of the support legs.
Starters and contactors with date code 7822 to 7935, model and serial numbers A10, All, A12, A13, A14, A20, A21, A22, and P10 are involved. Faulty units were manufactured and distributed between June 1, 1978 and August 30, 1979. The attached listing of nuclear plants, which have received some of this motor control equipment, represents a preliminary check of shipment records. This listing, however, may not be complete.
Gould, Inc., will recall uninstalled items for retrofit and has retrofit kits available for field installation.
Based on the above, licensees are advised to verify all motor starter and contactor shipments received from Gould, Inc., between June 1, 1978 and August 30, 1979, and assure that applicable model and serial number components are corrected by retrofit and subsequent electrical operation tests.
No written response to this Circular is required.
If you desire additional information regarding this matter, contact the Director of the appropriate NRC Regional Office.