MSIB a
NORTHERN STATES POWER COMPANY MIN N E A PO LI S. MIN N E S OTA 55401 October 31, 1979 Mr. R. F. lleishman, Chief Reactor Operations and Nuclear Support Branch Region III United States Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Mr. Heishman:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT Dockets No. 50-282 and No. 50-306 In response to your letter 6f October 9, 1979, which transmitted IE Inspection Reports No. 50-282/79-21 and No. 50-306/79-18, the following is offered:
Infraction 10 CFR 50, Appendix B, Criterion V states in part; Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings.
Contrary to cne above the inspector found that procedures 3ACD4.1 and 3AWI 5.3.4 were not adhered to in that forms for Design Change 77L397 were not properly completed and drawings for the design change had not been revised. This is an infraction.
Response
a.
The forms in the sections referenced in Design Change 77L397 have been completed.
In the future, no approval will be authorized before these sections are filled out completely.
b.
The required sign-off (initials) has been completed, and the revised checklist C28-2 issued. This item appears to be a result of a lack of understanding, and we intend to stress the design change requirements in our QA training sessions.
c.
The 11 drawings have been submitted to Drawing Control Services for revision.
It is expected that these drawings will be incorporated into the system and distributed within two months from the date of this letter.
1503 347 g, selB
\\.,.,
., ~
7912050 h/
NORTHERN STATES POWER COMPANY Mr. R. F. Heishman October 31, 1979 Page 2 The "new drawing" has been incorporated into the system and distributed.
We recognize the need to update drawings in a timely manner. A major effort will be undertaken to complete drawing revisi ns associated v h design changes.
Infraction 10 CFR 50, Appendix B, Criterion XVII states in part; " Sufficient records shall be maintained.
Records shall be identifiable and tetrievable.
Consistent with applicable regulatory requirements, the applicant shall establish requirements concerning record retention, such as duration, location, and assigned responsibility."
Contrary to the above, the inspector found that procedures 3 ACD 3.8, Rev. O and 5 ACD 3.4, Rev. 1 were not adhered to in that a general index listing required records has not been established or maintained listing retention times, where records are to be stored, and the location of records within a specific file. This is an infraction.
Response
It is anticipated that a " General Records Index" consisting of record retention times, location the records are to be stored, and the location of the records within a specific file will be established by December 31, 1979.
Prairie Island Nuclear Generating Plant is presently evaluating octside proposals for the establishment of a Total Records Management System which will provide a micro-media conversion process and records storage facility. The Records Management System for collection, conversion, storage, and maintenarce of records cannot be totally implemented by December 31, 1979, due to insufficient lead time for the procurement of equipment 'nd/or services.
In the interim, Prairie Island Nuclear Generating Plant will procure insulated filing devices [ (rated 350-1 hour) UL as to fire resistance only rating] to meet the requirements of 3 ACD 3.8, Rev. 2, " Records Management."
Deviation Based on the inspection conducted on July 9-13, 17-19, and August 1-3, 9, 1979, it appears that certain of your activities were not in accordance with commitments, codes, standards, guides or acceptable practices, as noted below.
NSP Company response to IE Bulletin 78-05 stated that the required inspections would be corpleted by June 1, 1979, and on February 22, 1979, 1503 348
NORTHERN STATES POWER COMPANY Mr. R. F. Heishman October 31, 1979 Page 3 the item was discussed during Onsite Review Committee meeting No. 399 reflecting that the commitments referred to above would not be completed prior to June 1, 1979.
Contrary to the commitment, all required inspections were not done by June 1, 1979, and as of July 13, 1979, no revision to the commitment date has been received.
Response
A method for tracking commitments has been implemented. This method should prevent deviations of this kind.
Yours very truly, L. J. Wachter Vice President - Power Production and System Operation cc:
Mr. G. Charnoff 1503 349
.