Forwards IE Insp Rept 50-309/79-12 on 790821-23.No Noncompliance Noted
ML19253C409
Person / Time
Site: Maine Yankee
Issue date: 10/16/1979
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Groce R
Maine Yankee
Shared Package
ML19253C412 List:
References
NUDOCS 7912050390
Download: ML19253C409 (2)


See also: IR 05000309/1979012

Text

{{#Wiki_filter:W-g

,, UNITED STATES [[ , o NUCLEAR REGULATORY COMMI5slON $ ., ) w( / g R EGION I ,,g 631 PARK AVENUE

  • ifr

. KING OF PRUS$1 A, PENNSYLV ANI A 19406 gw,

Docket No. 50-309 OCT 161979 Maine Yankee Atomic Power Company ATTN: Mr. Robert H. Groce Licensing Engineer 20 Turnpike Road Westborough, Massachusetts 01581 Gentlemen: Subject: Inspection 50-309/79-12 This refers to the inspection conducted by Dr. L. Bettenhausen of this office on August 21-23, 1979, at Maine Yankee Atomic Power Station, Wiscasset, Maine, of activities auth&ized by NRC License No. DPR-36 and to the discussions of our I findings held b. Dr. Bettenhausen with Mr. E. Wcod of your staff at the conclusion of the inspection, and to a subsequent telephone discussion between Mr. P. Anderson and Dr. Bettenhausen on August 27, 1979. Areas examined during this inspection are described in the Office of Inspection and Enforcement Inspection Report which is enclosed with this letter. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. Within the scope of tnis inspection, no items of noncompliance were observed. In accordance with Secticn 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to whhold such information from public disclosure. Any such application must be accompanied by an affidavit executed by the owner of the information, which identifies the document or part sought to be withheld, and which contains a statement of reasons which addresses with specificity the items which will be considered by the Commission as listed in subparagraph (b) (4) of Section 2.790. The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room. 1504 124 79120SO g

. . Maine Yankee Atomic Power 2 007 1 6 1979 Company No reply to this letter is required; however, if you should have any questions concerning this inspection, we will be pleased to discuss them with you. Sincerely, __i -- _ E d n-J. Brunner, Chief Re ctor Operations and Nuclear upport Branch Enclosure: Office of Inspection and Enforcement Inspection Report Number 50-309/79-12 cc w/ encl: E. Wood, Plant Superintendent E. W. Thurlow, President . 1504 125 }}