ML19253C343

From kanterella
Jump to navigation Jump to search
Forwards LER 79-090/03L-0
Date released: 09/24/2019 Download: ML19253C343


LER 79-090/03L-0:on 791031,containment Atmospheric Monitor Failed to Operate Properly & Low Sample Flow Was Noted. Caused by Condensate Drain Pot Solenoid Valve Failure Which Blocked Sample Flow.Solenoid Valve Was Replaced
ML19253C346
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 11/27/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19253C346 (2)
Forwards LER 79-090/03L-0
ML19253C342
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 11/27/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19253C342 (1)