Forwards IE Insp Repts 50-445/79-23 & 50-446/79-22 on 790927-28 & 1003-04.No Noncompliance Noted
ML19253C275
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/01/1979
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML19253C276 List:
References
NUDOCS 7911300423
Download: ML19253C275 (2)


See also: IR 05000445/1979023

Text

. - . -

-.- --. ....-....--_

_ . - . . . . . . . .

.-....-. _ ... . --_..._.... ..

7dC

.

,

UNITED STATES

  1. pa arouq'o,

NUCLEAR REGULATORY COMMISSION

y\\

,

/

R EGloN IV

,

n

<

o

611 RYAN PLAZA DRIVE, SUITE 1000

..

,

5

L[

ARLINGTON, TEXAS 76012

% ,,, g 8

November 1, 1979

In Reply Refer To:

RIV

Docket No.

50-445/Rpt 79-23

50-446/Rpt 79-22

Texas Utilities Generating Company

ATTN:

Mr. R. J. Gary, Executive Vice

President and General Manager

2001 Bryan Tower

Dallas, Texas 75201

Centlemen:

This refers to the inspection conducted by tk. C. R. Oberg of our staff

during the periods September 27-28 and October 3-4, 1979, of activities

authorized by NRC Construction Permits No. CPPR-126 and 127 for the

Comanche Peak facility, Units No. I and 2, and to the discussion of

our findings with Mr. R. G. Tolson and other members of your staff

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection con-

sisted of selective examination of procedures and representative records,

interviews with personnel, and observations by the inspector.

Within the scope of the inspection, no items of noncompliance were identi-

fied.

Two new unresolved iteras are identified ir. paragraphs 2 and 5 of the

enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be proprietary,

it is necessary that you submit a written application to this office, within

20 days of the date of this letter, requesting that such information be

withheld from public disclosure. The application must include a full state-

ment of the reasons why it is claimed that the information is proprietary.

The application should be prepared so that any proprietary information

identified is contained in an enclosure to the application, since the

application without the enclosure will also be placed in the Public Docu-

ment Room.

If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.

79133oo

l

1444 W

.

.

..

._

__

.

Texas Utilities Generating Company

2

November 1, 1979

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

'

,

'gl. C. Seidle, Chief

/ Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection Report No.

50-445/79-23

50-446/79-22

cc: w/ enclosure

Texas Utilities Generating Company

ATTN:

Str. II. C. Schmidt, Project !!anager

2001 Lcyan Tower

Dallas, Texas

75201

,