ML19253C225

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-327/79-48 & 50-328/79-26 on 790910-14.No Noncompliance Noted
ML19253C225
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/17/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19253C226 List:
References
NUDOCS 7911300228
Download: ML19253C225 (2)


See also: IR 05000327/1979048

Text

f/C'

i

f

UNITLD STATES

8

%

NUCLEAR REGULATORY COMMISSION

M

,

g

.. r

REGION 11

0

' #

101 MARIETTA ST

N.W., SUITE 3100

o

ATI.ANTA, GEORGIA 30303

.....

In Reply Refer To:

OCT i 7 mg

RII:LLJ

50-327/79-48

50-328/79-26

Tennessee Valley Authority

Attn:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, Tennessee 37401

Gentlemen:

This refers to the inspection conducted by L. L. Jackson and R. W. Zavadoski of

this office on September 10-14, 1979 of activities authorized by NRC Construction

Permit Nos. CPPR-72 and CPPR-73 for the Sequoyah Nuclear Plant facility, and to

the discussion of our findings held with W. E. Andrews at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within th'e scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) beiieve to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the r1asons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the doe went.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

.

1440 981

wssoo 9 M

~

$

DCT 171979

.

Tennessee Valley Authority

-2-

,

Should you have any questions concerning this letter, we will be glad to discuss

tbem with you.

Sincerely,

.

T dd

t

il

J. T. Sutherland, Chief

Fuel Facility and Materials

Safety Branch

Enclosures:

Inspection Report Nos. 50-327/79-48

and 50-328/79-26

cc w/ enclosures:

,

G. G. Stack, Project Manager

Post Office Box 2000

Daisy, Tennessee 37319

J. M. Ballentine

Plant Superintendent

Post Office Box 2000

Daisy, Tennessee 37319

J. F. Cox

400 Commerce Street

W10C131 C-K

Knoxville, Tennessee 37902

D. L. Lambert, Project Engineer

400 Chestnut Street Tower II

Chattanooga, Tennessee 37401

E. G. Beasley

Tennessee Valley Authority

309 Grant's Building

Knoxville, Tennessee 37902

.}kkO

-