--fI Docket No. 50-289 AllG W 1972
!!etropolitan Edison Company ATTN:
Mr. J. G. Miller Vice President P. O. Box 542 Reading, Pennsylvania 19603 Gentlemen:
In our 4.eal.lauing review of your application to operate the Three Mile Island Nuclear Station, Unit 1, we find that additional information is needed to complete our evaluation. The information required is described in the enclosure.
In order to maintain our licensing review schedule we will need a q
completely adequate response by September 12, 1972. Please info m us within 7 days af ter receipt of this letter of your confirmation of the schedule or the date you will be able to meet. If you cannot meet c.sr specified date or if your reply is not fully responsive to our requests it is highly likely that the overall schedule for completing the licensing review for this project will have to be extended. Since reassignment of the staff's efforts will require completion of the new assignment prior to returning to this project, the extent of extension will most likely be greater than the extent of delay in your response.
Sincerely, OriginalSignedBt R. b bekk,dsistant Director for Pressurized Water Reactors Directorate of Licensing
Enclosure:
Request for Additional Information ec: w/ enclosure See page 2 1505 126 omct >. PHR-2.,,,,
,,,,Q
,g Q
. AD/,P,WRs,,,,,,,
HSchierling Kkniel RCDeYoung SURfL'WE b 8/;J/72 8/ /72.......
8/30/72 DATE >
.. {
Forum AEC-318 (Rev. 9-13) AECM 0240
- c. s. w,VERNMENT PRINTDeG OFFICE : 1970 0 40s.34s
Metropolitan Edison Company cc: v/*nclosure General Public Utilities Service Corporation ATTN:
R. W. Howard Project Manager P. O. Box 1018 Reading, Pennsylvania 19603 Ceneral Public Utilities Service Corporation ATTN:
J. R. Thorpe Safety and Licensing Manager 260 Cherry Hill Roa 1 Parsippany, New Jersey 07054 Shaw, Pittman, Potts, Trowbridge & Madden ATTN:
Gerald Charnoff, Esq.
910 - 17th Street, NW Washington, D. C.
20006 Distribution:
AEC PDR Local PDR Docket file RP Reading PWR-2 Reading Attorney, OGC R. S. Boyd R0 (3)
R. C. DeYoung S. Hanacer, DR D. Skovholt RXXE F. Schroeder R. Maccary D. Knuth R. Tedesco H. Denten PWR Branch Chiefs R. W. Klecker H. Schierling 150b 127 M. Service (2)
I omcE >
SURNAME >
DATE >
Form AEC-Ste (% v. 9-Sh AECM 0240
- c. s. covtpNutNT Fatsix orrrCE : 1910 0 - 40$ 344
m
...t d'Mh,
UNITED STATES ci/
S 'Jf \\
ATOMIC ENERGY COMMISSION
's
- 2..C PJ wasconcTon o.c. mo
%\\
/$l W
s.r "I'EN August 31, 1972 Docket No. 50-289 Metropolitan Edison Company ATTN:
Mr. J. G. !Eller Vice President P. O. Box 542 Reading, Pennsylvania 19603 Gentlemen:
In our continaing review of your application to operate the Three Mile Island Nuclear Station, Unit 1, we find that additional information is needed to complete our evaluation. The information required is described in the enclosure.
In order to maintain our licensing review schedule we will need a completely adequate response by September 12, 1972. Please inform us within 7 days af ter receipt of this letter of your confirmation of the schedule or the date you will be able to meet.
If you cannot meet our specified date or if your reply is not fully responsive to our requests it is highly likely that the overall schedule for completing Since the licensing review for this project will have to be extended.
reassig. ment of the staf f's ef forts will require completion of the the extent of new assignment prior to returning to this project, extension will most likely be greater than the extent of delay in your
- response, Sincerely, i
/.
,4 1.
.-R. C. DeYoung, Assistant Director for Pressurized Water Reactors Directorate of Licensing
Enclosure:
Request for Additional Information cc: w/ enclosure See page 2 1505 128
Metropolitan Edison Company cc: w/ enclosure General Public Utilities Service Corporation ATTN:
R. W, Heward Project Manager P. O. Box 1018 Reading, Pennsylvania 19603 General Public Utilities Service Corporation ATTN:
J. R. Thorpe Safety and Licensing Manager 260 Cherry Hill Road Parsippany, Ncw Jersey 07054 Shaw, Pittman, Potts, Trowbridge & Madden ATTN:
Gerald Charnoff, Esc.
910 - 17th Street, NW Washington, D. C.
20006 t
6 1505 129
REQUEST FOR ADDITIONAL INFORMATION THREE MILE ISLAND UNIT 1 DOCKET No. 50-289 2.0 SITE 2.3 As discussed in your "En' ronmental Report - Operating License Stage" on page 2.5-2, a pumped storage facility is planned for construction on Stony Creek, upstream of the Three Mile Island site.
Describe this ' project in your FSAR for the Three Mile Island Nuclear Generating Station, Unit 1, and provide the following additional information to allow for an independent safety review:
a.
Provide sufficient information to assure that the proposed pumped storage plant can adequately pass its local probable maximum flocd and the basin probable maximum flood. Alte rnatively demonstrate that the effects of the failure of the facility during such floods will not adversely affect the Three >11e Island site.
b.
Provide cssurances that the proposed facility can adequately sustain its local safe shutdown earthquake.
In the event that such a conclusion can be furnished, postulate the arbitrary seismically induced failure of the structure and demonstrate analytically that the resulting flood wave will not adversely affect the Three Ydle Island site.
c.
In the event that the situations described in a. and b. above cannot be satisfied, that is that it cannot be shown that the Three Mlle Island site can safely withstand the ef fects caused by the inability of the proposed Stony Creek pumped storage facility to withstand the same level of natural c
phenomena severity suggested for nuclear power plants, describe how you intend to provide adequate flood protection for the Three Mile Island site for such conditions.
1505 130