UNIT TMI #1 4!F[76 DATE COMPLETED BY L. L. Lavfer 215-929-3601 TEL. NO.
r+. 111 v
DAILY PLANT PC'4ER OUTPUT MONTH Aucust DAY AVERAGE DAILY M'de-net DAY AVERAGE DAILY M'Je-net 1
788 21 765 2
793 22 775 3
792 23
_775 h
788 2h 776 5
785 25 772 6
316 26 767 7
332 27 73h 8
3hh 28 313 9
665 29 319 10 77h 30 558 11 782 31 769 12 779 13 777 1h 779 15 781 16 787 1505 287
'8 18 366 19 326 7913310 6 3 7
. The unit operatei at full power from 8/l thru 8/5 On 8/6 power was reduced UNI'r NAME
'rMI-Um 1 7, to isolate half of the main condenm. to locate tube leaks. Power escalation on 8/9 and full power operation was achieved on 8/10 and maintained thru 8/17 DATE 18 power was reduced to 50% again te try to isolate main condenser tube leaks.
power operation was regained on 8/2.1 and the unit remained at full power thru COMPLETED BY L. L. Lawyer On 8/28 power was reduced to 507, for the third time to work on the main nser tubes. Power was returned to 1007 on 8/31.
TEL. NO. 215-929-3601 Ext,.111 REPORT MONTH AUGUST PLANT SHUTD0W NS
(
,/ ~
TYFr.
METHOD OF F-FORCED DURATICf; SHUTTING DOWN ATE S-SCHEDULED (HOURS)
REASON (1)
THE REACTOR (2)
COMMENTS 06/76 F
0 A
!!A Main condenser tube leaks 18/76 F
0 A
NA Main condenser tube leaks 38/76' S
0 A
NA Main condenser tube leaks C
(
(
(1) REASON:
(2) MPrHOD:
W A-EQUIPMENT FAILURE (EXPLAIN)
A-MANUAI!
O B-MAINT. OR TEST B-MANUAL SCRAM W
C-REFUELING C-AUTOMATIC SCf D-REGULATORY RESTRICTION 6
E-OPERATOR TRAINING AND LICENSE EXAMINATION g
F-ADMINISTRATIVE G-OPERATIONA,L ERROR t v.n,
....