ML19253B903

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Aug 1976
ML19253B903
Person / Time
Site: Crane 
Issue date: 09/08/1976
From: Arnold R
METROPOLITAN EDISON CO.
To: Mcdonald W
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19253B904 List:
References
GQL-1280, NUDOCS 7910310637
Download: ML19253B903 (2)


Text

NRC ronu 195 u.s. NUCLE AR REQULATORY WM310N DOCKET NUMSE R (2 788 s

50-239

  1. NRC OISTRIBUTION ron PART 50 DOCKET MATERIAL

h'o$"t REPORT TO *.

FROM:

DATE OF OCCUMENT Metropolitan Edison Company 9/3/76 Mr. U. G. Mcdonald Reading, Pa.

o47s agegivgo R. C. Arnold 9/20/76 gLETTER O NOTORIZ E O PROP INPUT FORM NUMBER CP COPIES RECEIVED O caictN AL (yNcLAggggggg Qng 3[gned copy KCoPy DESCRIPTION ENCLQSU8aE LETTER TRANS THE FOLLOWING:

MONTHLY REPORT FOR Aucust, 1476 PLANT & COMPONENT OPERABILITY &

AVAILABILITY. THIS REPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS & OPERATIONS.

PLANT NAME:

(l-P)

( P )--

?

<<7 nn-uuub Three Mile Island 41 DO NOT REMOVE 1505 284 b^82 ll FOR ACTION /INFORMATION thVidU 9/21/76 RJL

'1 MIPC W/4 CYS FOR ACTION INTERNAL DISTRIBUTION m

N @GELE 3 Y NRC PDR Y

MCD01\\LD N

S. CitAl%W N BRANCH C11IEF(L)

Reid

%_.LIC ASST-fu Intran l

EXTLitNAL DI:;Titil!UTION CJNTilOL NUMitLit

,LPDit: HarrisburR.Pa.

TIC

'USIC

/f$Yf M

'eum -

pw 6

l S

l qsp 1272

,/

/

ME'l H6POLITAN EDISON COMPANY sussroiany or cesenat rustic uritirics conronarion ST OFFICE BOX 542 READING, PENNSYLVAN' A 19603 TELEPHONE 215 - 929 3601 Septe=ber 6, 1976 GQL 1280

[

Q N,

p SEP[",.Jr, Director of Nuclear Reactor Regulatien Attn: l'r. W. G. Mcdonald, Director

,-9 k';< : -

'0/ 0 s i l

'f Office of Management Information & Program Control Q, ', ;; m o

U.S. Nuclear Regulatory Co==ission 4

M)c; 4

, p

Washington, D.C.

20555 i.c.

Lear Sir:

Operating License Ilo. DPR-50 Docket No. 50-289 Enclosed please find the August 1976 Operating Status Report for '!hree Mile Island Nuclear Station Unit 1.

Sincerely,

/

h R. C. A.nold

/pf-N h,

/

Vice President

/ N

'c's D

    • y$uY A\\

yI:

f, P jg RCA:JMC:=ft

/

Enclosure W f cf. b !

N t- /

'~

  1. s. Q".a *y / g/

i Of cc: Mr. J. P. O'Reilly, Director Office of Inspection & Enforcement, Re6 ion I Vj,'.s (N

U.S.

iuclear Regulatory Cc==ission

'N' N

\\

031 Park Avenue

'O';

King of Prussia, Pennsylvania 19h06 9549

& ATC,] 5.".15?.E E E 1505 285

UNIT *NAME TMI #1 DATE COMPLETED BY L. L.

Lawer TEL. NO.21u20 7601 vv+ -

1 0PERATING STATUS 1.

REPORTING PERIOD:

0001,760601 THROUGH ohnn_74 nae, i

GROSS HOURS IN REPORTING PERIOD:

Thh 2.

CURRENTLY AUTHORIZED POWER LEVEL MWt 2535 FWe-NET 200 (MAXIMUM DEPENDABLE CAPACITY - MOC)

\\

3 POWER LEVEL TO WHICH RFSTRICTED (IF AITY):

None k.

REASONS FOR RESTRICTIONS (IF ANY):

IA THIS CUMULATIVE MONTH YR-TO-DATE TO DATE 5

HOURS REACTOR WAS CRITICAL,

7hh 3577.7 13590.3 0

6.

REACTOR RESERVE SHUTDOWN HOURS.

0 0

7hh 3501.7 13262.6 7

HOURS GENERATOR ON-LINE 8.

UNIT RESERVE SHUTDOWN HOURS O

O O

9 GROSS THERMAL POWER GENERATED (m3) 1,598,875 83472h7

mv=c;v 10.

GROSS ELECTRICAL POWER GENERATED (53).

523,903 2775h75 1cS05e8o 11.

NET ELECTRICAL POWER GENERATED (MWH)

L90,215 2586253 10105568 12.

REACTOR AVAILABILITY FACTOR (1) 100%

61.15 77.65 13 UNIT AVAILABILITY FACTOR (2)..

10Cf 5 9. 5f, 7 5,7 ",

S 3. 2f, 55.85 72.c5 14.

UNIT CAPACITY FACTOR (3).

05 1.c5 7. 5 ~,

15 FORCED OUTAGE RATE (h).....

16. SHUTDOWNS SCHEDULED TO BEGIN IN ?iEXT 6 MONT'IS (STATE TYPE, DATE, AND DURATION OF EACH):

None 1505 286