ML19253B751
| ML19253B751 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 01/21/1974 |
| From: | Nelson P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | John Miller METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19253B752 | List: |
| References | |
| NUDOCS 7910180739 | |
| Download: ML19253B751 (2) | |
See also: IR 05000289/1973029
Text
Is
' - ' '
'
ATOMIC E E GY O MISSION
r0
'
'
,,
[
g,
DIRECTO R ATE OF R EG U R.ATO RY OPER ATION S
REG 80N1
631 PARK AVENUE
/
%,
[
KING OF PRUSSI A. PENNSYLVANI A 19406
JAN 211974
-
Metropolitan Edison Company
License No. CPPR-40
Attenticin: Mr. J. G. Miller
Inspection No. 50-289 73-29
Vice President
P.O. Box .;42
Reading, Pennsylvania 19603
,
Centlemet.:
This refers to the inspection conducted by Mr. Meyer of this office
on December 27 and 28,1973 at Three Mile Island 1 of activities
authorized by AEC License No. CPPR-40 and to the discussions of
our findings held by Mr. Meyer with Mr. Herbein and other members
of your staff at the conclusion of the inspection.
Areas evenined during this inspection are described in the Regulatory
,
Operations Inspection Report which is enclosed with this letter.
utthin these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel,
and observations by the inspector.
fq
Within eb a scope of this inspection, no violations or safety
items were observed.
.
.
In accordance with Section 2.790 of the AEC's " Rules of Practice",
'
Part 2, Title 10, code of yederal Regulations, a copy of this
letter and the enclosed inspection report will be placed in the
AEC's Public Document Room. If this report contains any information
that you (or your contractor) believe to be proprietary, it is
accessary that you make a written application within 20 days to
I
this office to withhold such information from public disclosure.
Any such application must include a full statement of the
reasons on the basis of which it is e1=4=d that the information
t
j
is proprietary, and should be prepared so that proprietary'
j
information identified in the application is contained in a
i
separate part of the document. If we do not hear from you in
l
this regard within the specified period, the report will be
.
j
placed in the Public Document Ecom.
i
i
P00R ORR M
l
)hhk
bJ
t.
i
~'F
JXX
" f
)
'dN
/fg' gk -
~
CRESS
ecr >
uAv1
. ct.d uk
u
SUR9tAbfr >
. . . . . * .
k."
. .
[
'
g
r
narr >
. . . . . . . . . . . . . . . .
. . .. . l. .!. ... . . . ....
I
....
roo. AEC-5la @.9 33) AECM ONO
p}8O
Cf
_
_ . . . - - -
-
.
.
-
- -
-
.
.
.
~r-
.
Metropolitan Edison Company
-2-
.
r'.
l k.)
No reply to this letter is required; however, if you should have any
i
questions concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
i
4
J-"
l"
Paul R. Nelson, Chief
Radiological & Environmental
'
Protection Branch
Enclosure:
RO Inspection Report No. 50-289/73-29
cc:
R. C. Arnold, Manager of Production, Met Ed
J. Herbein, Superintendent TMI Nuclear Station
'
R. W. hiard, Project Manager, GPUSG
T. M. Crimmins, Jr. Safety and Licensing Manager, GPUSC
_ _ _ . _ . _ . - . . _ . . - . _ . . . . . . .
.. .
. . . . _ .
_ . ,
-.
...-
bec (w/encis):
.
RO Chief, FS&EB
RO:HQ.(5)
DL (4 w/ene1s pl
9 cys of Report Only)
DR Central Fil
,
RS (3)
i
Local PDR
'
RO Files
'
ITIIE
State of Pennsylvania
RRR Room
.
I
e
b
}
l,
p
\\4A\\
,
v
...--.............
-.------- ...----- - - - -
- -- --.
~~-'
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ " '
-
omcE>
..................
,............---..
......--..-------
- ----------------
' * - * * * * * * - * * * * * * * * *************
SURNAME)
_.
.....e
. . _ _ _ . _
.m
_ . . _ _
.
,.__..y..
. _ _ _ .
__ _ _ _ . __ _..