Forwards Insp Rept 50-289/74-03 on 740130-31.No Noncompliance Noted
ML19253B712
Person / Time
Site: Crane Constellation icon.png
Issue date: 02/25/1974
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: John Miller
METROPOLITAN EDISON CO.
Shared Package
ML19253B713 List:
References
NUDOCS 7910180700
Download: ML19253B712 (2)


See also: IR 05000289/1974003

Text

ururco sT ATcs

O

/g, q**-

g

ATOMIC ENERGY COMMISSION

-

-

]

OIRECTOM ATE OF" REGULATORY OPER ATIONS

'

N

.

REGION 9

T7eN a s rt L.s. a

%,C @ j*

'

y,-

reewnme:wtwvertser m u

'

o,,y e

631 Park Avenue

King of Prussia, Pennsylvania 19406.

FEB o 5974

~

Metropolitan Edison Company

License No. CPPR-40

Attention:

Mr. J. G. Miller

Inspection No. 50-289/ 4-03

Vice President

Box 542

Reading, Pennsylvania 19603

,

Gentlemen:

-

This refers to the inspection conducted by Mr. Folsom of this office

on January 30-31, 1974 at Middletown, Pennsylvania of activities

authorized by AEC License No. CPPR-40 and to the discussions

of our findings held by Mr. Folsom with Mr. Gunn and Mr. Wright

of your staff at the conclusion of the inspecticn.

Areas examined during this inspection are described in the Regulatory

,

Operations Inspection Report which is enclosed wi.th this letter.

Within these areas, the inspection consisted of selective examinations

(

of procedures and representative records, interviews with personnel,

and observations by the inspector.

Within the scope of this inspection, no violations or safety

items were obsetved.

-

In accordance with Section 2.790 of the AEC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter and the enclosed inspection report will be placed in the

AEC's Public Document Room.

If this report contains any information

that you (or your contractor) believe to be proprietary, it is

necessary that you ma'.e a written application within 20 days to

this-office to withhold such information from public disclosure.

Any such application must include a full statement of the

reasons on the basis of which it is claimed that the information

is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a

separate part of the document.

If we do not hear from you in

this regard within the specified period, the report will be

placed in the Public Document Room.

.

.

w

1445 394

fY

ff910180700

@

-

.x

y

-

'

.

Metropolitan Edison Company

-2-

No reply to this letter is required; however, should you have any

questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

N

L

"

Robert T. Carlson, Chief

Facility Construction and Engineering

Support Branch

Enclosure:

R0 Ins, ection Report No. 50-289/74-03

,

'

.

bec (w/encis):

(_'

R0 Chief, FS&EB

R0:HQ (5)

DL (4 w/encls plus 9 cys of Report Only)

DR Central Files /

RS (3)

.

PDR

Local PDR '

RO Files

.

NSIC

UTIE

State of Pennsylvania

.

.

-

1445 095

.

'P%